Machine Studies

Schedule for Run02-5, 2017

June 26th 0800 - June 28th 0800



Time

Descriptions

Studiers

SR Status


Monday, June 26, 2017



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0930-1030

Adjust flow meter trip settings B:ES2

Vanis

No Injection

0930-1130

Swap sextupoles for upgrades

Ackley

No Beam

0930-1200

Install and test LRF databases

Pietryla

Limited Injection

1200-1400

Optimize PAR/Booster rf frequency ramp. Need to change rf frequency

Yao, Lenkszus

No Beam

1400-1500

test Booster B3C0H with modified shunts with beam

Yao, Hillman, Shang

No injection

1500-2100

hybrid setup with proper chromaticity and injection optimization

Emery, Xiao, Yao

Stored beam and injection

2100-2400

Orbit switch

Xiao

Stored beam and injection


Tuesday, June 27, 2017



0000-0100

Orbit switch

Xiao

Stored beam & injection

0100-0300

PAR operator training (23-07)

Christensen/ Smith

Limited Injection

0300-0800

OPEN



0800-1000

Linac RF recovery script testing

Yine Sun

Stored beam

1000-1200

Abort kicker check-out

Harkay

Stored beam & injection

1200-1700

Booster on-momentum studies (no storage ring beam, rf freq change

Harkay, Calvey, Berenc, Emery, Yao

No beam

1700-2200

Booster high charge studies, investigate limit, characterize beam

Harkay, Calvey, Berenc, Yao

Stored beam

2200-2400

Sector 26 Compton XBPM testing

Yang

Stored beam & injection


Wednesday, June 28, 2017



0000-0400

Sector 26 Compton XBPM testing (continued)

Yang

Stored beam & injection

0400-0600

PAR operator training (23-07)

Christensen/ Smith

Limited Injection

0630-0800

Prepare for User beam

OPS

Stored Beam & Injection