Machine Studies
Draft Schedule for Run02-7, 2017
July 10th 0800 - July 11th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, July 10, 2017 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0930-1130 |
Remove the HV power supply in SR AK0 Kicker power supply for repair |
Vanis |
No impact |
0930-1300 |
Further investigate noise and erratic readbacks from Booster Extraction interlock system |
RF Group |
No injection Possible Booster Access |
0930-1130 |
Investigate blown Dump fuses in SR Raw T2 in sector 26:27 |
Vargas |
No beam |
0930-1230 |
replace a Metasys switch in Auditorum network closet -- May trip pump 405 (S1&2) off |
Westbrook |
No beam |
0930-1130 |
Swap sextupoles for upgrades in Zone B |
VargasAckley |
No Beam |
1000-1130 |
Replace S38 RF cavity blower |
Pace/McKenzie |
Zone F Access |
1000-1130 |
Replace S38 Cav.3 Limit Switch and/or cable |
RF Group |
Zone F Access |
1030-1230 |
Investigate S23 water leak |
Bechtold |
Zone D access |
1000-1100 |
Switch from RF1 to RF4 |
RF Group |
No beam |
1230-1600 |
PAR setup (1st hour or two) and Measure booster chrom and disp, and optimize on-momentum injector efficiency. Need to change rf frequency |
Yao, Lenkzsus |
No beam |
1300-1500 |
Investigate why SR sector2AV3 converter DAC read-back is dropping out |
Jordan |
No beam |
1600-1800 |
Test BPLD script |
Sereno/Shang |
Stored beam & injection |
1800-1900 |
Test FPGA bpm configuration for hybrid |
Sereno/Shang |
Stored beam & injection |
1900-2300 |
Orbit Switch to 324 singlets |
Xiao |
Stored beam & injection |
2300-2400 |
hybrid mode robustness to parameters |
Emery/Sajaev |
Stored beam & injection |
|
Tuesday, June 13, 2017 |
|
|
0000-0200 |
hybrid mode robustness to parameters (continued) |
Emery/Sajaev |
Stored beam & injection |
0200-0600 |
orbit stability and AC response matrix measurement |
Sajaev |
Stored beam & injection |
0630-0800 |
Add back bpms removed during hybrid to orbit control configuration (parasitic to preparing for User beam) |
Sereno |
Stored beam & injection |
0630-0800 |
Prepare for User beam (324 singlets) |
OPS |
Stored Beam & Injection |