Machine Studies

Draft Schedule for Run03-1, 2017

September 26 0800 – October 3 0800

Time

Descriptions

Studiers

SR Status


Monday, September 25, 2017 (Pre-studies)



0900-1100

Setup orbit to include new ID4 canting angle

L. Emery

Stored Beam & injection

1100-2400

RF Condition with Beam

OPS

Stored Beam & injection

1400-1800

Orbit feedback checkout

Sereno

Stored Beam & injection


Tuesday, September 26, 2017



0000-2000

RF Condition with Beam

downtime included in this time

OPS

Stored Beam & injection

1500-2000

BPM checkout

Sereno

Stored Beam & injection

2000-2400

BPLD validations

Hahne

Stored Beam & injection


Wednesday, September 27, 2017



0000-0200

Xray BPM sanity check

Hahne

Stored beam & injection

0200-0600

Initial lattice setup

Sajaev

Stored Beam & injection

0600-0730

BPM offset measurement

Xiao

Stored Beam & injection

0730-1100

Orbit Recovery

Xiao

Stored Beam & injection

1100-1400

PAR streak camera checkout

Yao/Calvey/

Hui

No injection

1100-1400

PAR high-charge study

Calvey/Berenc/Harkay

No injection

1130-1200

Prepare for SR accesses

OPS/FMS

No beam

1200-1300

Exchange one radiation dose badge from Sector #27 & recovery from access

Dombrowski/Vacca

Zone D acceccess

1400-1700

Booster steering script test and steering studies

Yao/Shang

No injection

1800-2100

Injection verification

Emery/Sajaev

Stored Beam & injection

2100-2400

Test APS-U commissioning software

Sajaev

Stored Beam & injection


Thursday, September 28, 2017



0000-0400

IEX checkout

OPS

Stored Beam & injection

0400-0800

CPU checkout

OPS

Stored Beam & injection

0800-0900

RF waveguide switch

RF Group

No Beam

0900-1200

HSCU test chamber beam based alignment study (25 mA)

Harkay/Sun/

Merritt

Stored Beam & injection

1200-1300

Abort kicker checkout with BLM

Harkay/

Dooling

Stored Beam & injection

1300-1700

Closed loop response matrix measurement S27/28

Sereno/

Carwardine

Stored Beam & injection

1800-2000

Booster SD software test

Yao et al

No injection

2000-2400

Booster on-momentum study

Yao/Harkay

No injection


Friday, September 29, 2017



0000-0600

Compton XBPM study in S26

Yang

Stored Beam & injection

0600-0730

Open



0730-0800

Switch pump 503 to back for repair (P.S. in S2,3,4,5 set to 0)

Wright

No beam

0800-1100

Set up 6 GeV lattice for RHB-S7S32

Emery

Stored Beam & injection

1100-1400

Momentum aperture measurement at 6 and 7 Gev

Emery

Stored Beam & injection

1400-1800

Test AC response matrix measurement

Sajaev

Stored Beam & injection

1800-2200

Final lattice setup

Sajaev

Stored Beam & injection

2200-2400

Test abort kicker

Harkay, Dooling

Stored Beam & injection


Saturday, September 30, 2017



0000-0400

Test new XRDP configuration

Sereno

Stored Beam & injection

0400-1000

Open



1000-1800

CPU correction

Xiao

Stored Beam & injection

1800-2000

ID4 aperture measurement

Emery

Stored Beam & injection

2200-2400

Accumulation limit

Emery

Stored Beam & injection

2300-2400

Operator training

E. Smith

No injection


Sunday, October 1, 2017



0000-0100

Operator training

E. Smith

No injection

0100-1100

Top-up Operations checkout

OPS

Stored Beam & injection

1100-1900

IEX correction

Xiao

Stored Beam & injection

1900-2300

Par studies

Harkay

Limited injection

2300-2400

Operator training

E. Smith

No injection


Monday, October 2, 2017



0000-0100

Operator training

E. Smith

No injection

0100-0700

Grid xBPM study in sector 6

Yang

Stored Beam & injection

0700-0900

Pinhole camera and bunch purity setup

Yang

Stored Beam & injection

0900-1000

Open



1000-1400

IEX control test

Smith/Xiao

Stored Beam & injection

1400-1700

Linac PEM tool testing

Pasky/Soliday

No injection

1700-2100

Investigation of PAR efficiency

Yao

No injection

2100-2400

Booster response measurement

Yao

No injection


Tuesday, October 3, 2017



0000-0100

Booster response measurement

Yao

No injection

0100-0600

Final orbit checkout

Xiao

Stored Beam & Injection

0600-0800

Prepare for user Operations (24 singlets – Top-Up)

Ops

Stored Beam & Injection