Machine Studies

Draft Schedule for Run03-10, 2017

December 11th 0800 – December 12th 0800



Time

Descriptions

Studiers

SR Status


Monday, December 11, 2017



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Pump vibration tests with <1mA

Emery/MOM

Stored Beam & Injection

0930-1030

Isolate accelerator network from APS and verify operation

Leibfritz/OPS

Stored Beam & Injection

0930-1130

Thermal scan Zone D correctors

Puttkammer

No Beam

0930-1130

Upgrade GesADC for Booster Gespacs

Donkers

Limited Injection

1130-1200

Recover SR beam/make open gaps saves

OPS

Stored Beam & Injection

1130-1300

SR requalification

Schroeder/Bogdan/Grodecki

Stored Beam & Injection

1300-1500

Topup interleaving testing

Sun/Shang/ Keane

Stored Beam & Injection

1500-1800

Booster local steering test

Yao/Shang

Limited Injection

1500-1600

Quad hysteresis measurements

Emery

Limited Injection

1800-1900

SR requalification

Schroeder/ Christensen

Stored Beam & Injection

1900-2000

SR requalification

Christensen/ Weyer

Stored Beam & Injection

2000-2400

ID local impedance measurement

Sajaev

Stored Beam & Injection


Tuesday, December 12, 2017



0000-0500

BTS measurement

Xiao

No Injection

0500-0700

SR training (23:00-07:00)

Smith/Fystro

Stored Beam & Injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection