Machine Studies
Draft Schedule for Run03-10, 2017
December 11th 0800 – December 12th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, December 11, 2017 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Pump vibration tests with <1mA |
Emery/MOM |
Stored Beam & Injection |
0930-1030 |
Isolate accelerator network from APS and verify operation |
Leibfritz/OPS |
Stored Beam & Injection |
0930-1130 |
Thermal scan Zone D correctors |
Puttkammer |
No Beam |
0930-1130 |
Upgrade GesADC for Booster Gespacs |
Donkers |
Limited Injection |
1130-1200 |
Recover SR beam/make open gaps saves |
OPS |
Stored Beam & Injection |
1130-1300 |
SR requalification |
Schroeder/Bogdan/Grodecki |
Stored Beam & Injection |
1300-1500 |
Topup interleaving testing |
Sun/Shang/ Keane |
Stored Beam & Injection |
1500-1800 |
Booster local steering test |
Yao/Shang |
Limited Injection |
1500-1600 |
Quad hysteresis measurements |
Emery |
Limited Injection |
1800-1900 |
SR requalification |
Schroeder/ Christensen |
Stored Beam & Injection |
1900-2000 |
SR requalification |
Christensen/ Weyer |
Stored Beam & Injection |
2000-2400 |
ID local impedance measurement |
Sajaev |
Stored Beam & Injection |
|
Tuesday, December 12, 2017 |
|
|
0000-0500 |
BTS measurement |
Xiao |
No Injection |
0500-0700 |
SR training (23:00-07:00) |
Smith/Fystro |
Stored Beam & Injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |