Machine Studies

Draft Schedule for Run03-11, 2017

December 18th 0000 – December 18th 2400



Time

Descriptions

Studiers

SR Status


Monday, December 18, 2017



0000-0010

Collect XBPM orbit data

OPS

Stored Beam & Injection

0010-0110

Operator requalification

Christensen/Weyer

Stored Beam & Injection

0110-0600

Reference machine status recording

Emery

Stored Beam & Injection

0600-0700

SR steering test with SR beam

Emery/Shang

Stored Beam & Injection

0700-0800

Operator training

Fystro/Smith

Stored Beam & Injection

0800-1200

Higher reflected power booster cavity detuning test

Harkay/Calvey/Yao/RF

No injection

1200-1300

SR requalification

Schroeder/Grodecki

Stored Beam & Injection

1300-1700

PAR RF1 absorptive filter test

Calvey/Goel/Harkay

No injection

1700-2200

ID4 local impedance measurement

Sajaev

Stored Beam & Injection

2200-2400

Machine slow shutdown

OPS

No Injection