Machine Studies
Draft Schedule for Run03-2, 2017
October 9th 0800 – October 10th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, October 9, 2017 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0900 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0900-1100 |
Test Linac power control-law tool |
Soliday/Pasky |
Limited Injection |
1100-1400 |
RG1 checkout |
Sun/Pasky/ Dooling |
No Injection |
0930-1330 |
Install and test filter for PARRF-1 |
Goel |
No Injection |
0930-1130 |
Investigate RF-5 crowbar trips |
Trento |
No Injection |
0930-1130 |
Test run revolver at ID-35 |
Smith |
No Stored Beam |
0900-1500 |
Paving /compacting by bldg 450 |
FMS |
No Stored Beam |
1000- ? |
Leak check at 9BM |
Vacuum group |
Access Zone A/B |
1100-1200 |
Swap IR meter at S38 |
Wright |
Access Zone F |
1400-1800 |
PC gun study |
Sun/Zholents/ Dooling/Pasky |
No Injection |
1800-2000 |
Injector study |
Yao |
Limited Injection |
2000-2400 |
PAR high charge studies |
Calvey/Harkay Yao/Dooling |
Limited Injection |
2000-2400 |
S27 integrated beam stability study |
Sereno, et al. |
Limited injection |
|
Tuesday, October 10, 2017 |
|
|
0000-0200 |
PAR high charge studies |
Calvey/Harkay Yao/Dooling |
Limited Injection |
0200-0700 |
Injection into small DA machine |
Xiao |
Stored Beam & Injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |