Draft Schedule for Run03-2, 2017

October 9th 0800 – October 10th 0800



Time

Descriptions

Studiers

SR Status


Monday, October 9, 2017



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0900

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0900-1100

Test Linac power control-law tool

Soliday/Pasky

Limited Injection

1100-1400

RG1 checkout

Sun/Pasky/ Dooling

No Injection

0930-1330

Install and test filter for PARRF-1

Goel

No Injection

0930-1130

Investigate RF-5 crowbar trips

Trento

No Injection

0930-1130

Test run revolver at ID-35

Smith

No Stored Beam

0900-1500

Paving /compacting by bldg 450

FMS

No Stored Beam

1000- ?

Leak check at 9BM

Vacuum group

Access Zone A/B

1100-1200

Swap IR meter at S38

Wright

Access Zone F

1400-1800

PC gun study

Sun/Zholents/ Dooling/Pasky

No Injection

1800-2000

Injector study

Yao

Limited Injection

2000-2400

PAR high charge studies

Calvey/Harkay Yao/Dooling

Limited Injection

2000-2400

S27 integrated beam stability study

Sereno, et al.

Limited injection


Tuesday, October 10, 2017



0000-0200

PAR high charge studies

Calvey/Harkay Yao/Dooling

Limited Injection

0200-0700

Injection into small DA machine

Xiao

Stored Beam & Injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection