Machine Studies
Draft Schedule for Run03-3, 2017
October 16th 0800 – October 17th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, October 16, 2017 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-1000 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
1000-1200 |
PAR 40° compensation phase shifter tests |
T. Smith |
Limited Injection |
1000-1300 |
Shutdown EMCC X1-9 to repair bucket for exhaust fan for 33-ID-E |
Kailus |
No Beam |
1000-1200 |
Booster console exam |
Smith/Pasky |
Parasitic to PSR studies |
1030-1130 |
Remove TLDs at S27 |
Dombrowski |
Acces Zone D |
1200-1400 |
Linac power control law testing |
Pasky/Soliday |
Limited Injection |
1000-1400 |
Booster Energy Saver Software Test |
Control |
No Beam |
1400-1430 |
SR recovery |
OPS |
Stored Beam & Injection |
1430-1630 |
Interleaving with SR topup |
Y. Sun et al |
Stored Beam & Injection |
1600-1700 |
SR corrector feed forward test |
H. Shang/L. Emery |
Stored Beam & Injection |
1700-1900 |
PAR vertical beam size measurement with streak camera |
C. Yao/B. Yang/ J. Calvey/D. Hui |
Limited injection |
1900-2100 |
Booster BM bdot coils signal measurement |
C. Yao/T. Puttkammer |
No Beam |
2100-2400 |
Injection into small DA machine |
A. Xiao |
Stored Beam & Injection |
|
Tuesday, October 17, 2017 |
|
|
0000-0300 |
Chracterize 6 GeV lattice |
L.Emery |
Stored Beam & Injection |
0300-0600 |
ID feedforward characterization |
L. Emery |
Stored Beam & Injection |
0600-0700 |
SCU1 checkout |
L. Emery |
Stored Beam & Injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |