Machine Studies
Draft Schedule for Run03-4, 2017
October 23rd 0800 - October 24th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, October 23, 2017 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0930-1130 |
Swap out SR Quadrupole converters for preventative maintenance in Zone F |
Vargas |
No Beam |
0930-1130 |
Investigate (replace Gespac crate) the loss of communication in SR sector 7 cabinet 5 |
Jordan |
No Beam |
0930-1130 |
Take scope measurements on the Par Kickers and Septum power supplies |
Goetzen |
No Injection |
0930-1130 |
Start upgrading the GesADC Board in the Gespacs down Linac |
Donkers |
No Injection |
0930-1000 |
Switch pump from backup to 503 (P.S. in S4,5,6,7 set to 0) |
Wright |
No beam |
0930-1130 |
Investigate L5 modulator/LLRF system trips |
Goel/OPS |
No injection |
1000-1200 |
Connect a scope to the B:IK kicker to try and identify why the kicker drops to zero unexpectedly |
Hillman |
No Injection |
0930-1000 |
switch over Booster pump 301 to backup (not bumpless -- all ramping supplies, appropriate correctors, and Injection pulsed P.S., PTB BM P.S. and RF should be off) |
Wright |
No injection |
1000-1200 |
Booster SD-U acquisition test |
Yao, Stevens, Shang |
No impact |
1030-1130 |
Develop a RF procedure to go between 6 Ge V and 7 GeV |
Horan/Emery |
No Beam |
1130-1200 |
Recover storage-ring |
OPS |
No injection |
1200-1500 |
PC gun interleaving study |
Dooling/Sun |
Stored Beam & Injection |
1200-1300 |
Linac/PAR BESOCM Trigger study |
Sun/Keane/Pietryla |
Stored Beam & Injection |
1300-1500 |
Low-frequency beam motion recording |
Sajaev |
Stored Beam & Injection |
1500-1800 |
6 GeV with rf < 7 MV |
Emery/Horan/Harkay |
Stored Beam & Injection |
1800-2400 |
PAR high-charge study |
Harkay/Calvey/Dooling/Yao |
Limited Injection |
|
Tuesday, October 24, 2017 |
|
|
0000-0400 |
6 GeV Touschek lifetime measurements |
Xiao |
Stored Beam & Injection |
0400-0700 |
Setup orbit for Hybrid |
Xiao |
Stored Beam & Injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |