Machine Studies

Draft Schedule for Run03-5, 2017

October 30th 0800 – November 1st 0800



Time

Descriptions

Studiers

SR Status


Monday, October 30, 2017



0800-0810

Collect XBPM orbit data

OPS

Stored Beam &

Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0930-1030

Investigate loss of magnet setpoints on ioclirfgun

Pietryla

No Injection

0930-1030

Shut off SRVC 2 pump skid for inspection

Wright

No beam

0930-1130

Investigate loss of communication with Sector 13 cabinet 4

Jordan

No Beam

0930-1130

Turn on control power BSD-U PS and verify controls

Puttkammer

Limited Injection

0930-1130

Swap out SR quad converters Zone F

Vargas

No Beam

1100-1300

Voltage measurement on PAR BPMs

Wienads/ Brill et al

PAR Beam

0930-1330

Waveguide switch to RF-3 providing Booster

RF Group

No Beam/Injection possible after 1030

1330-1400

SR recovery

OPS

Stored Beam & Injection

1400-1500

Test tune measurement on different bunch current

Sereno/Brill/Sajaev

Stored Beam & Injection

1500-1700

Response matrix measurement

Sereno/Shang/Sajaev

Stored Beam & Injection

1700-2100

Setup hybrid

Sajaev

Stored Beam & Injection

2100-2300

SR training

E. Smith

Stored Beam & Injection

2300-2400

Open




Tuesday, October 31, 2017



0000-0700

Open



0700-0800

Prepare for bus tie work

OPS

No beam

0800-1400

Install bus tie for work one 13.2 kV feed to APS -- All Bldg. 420 RF systems off, Booster main ramping supplies and SR P.S. off

Janik

No beam

0800-1000

PAR streak camera timing investigation

Lenkszus/Yao

No Beam

1000-1200

Voltage measurement on PAR BPMs (continued)

Wienads/ Brill et al

PAR Beam

1200-1400

PC Gun beam study

Sun/Shang

Limited Injection

1400

Remove bus tie



1400-1600

Topup interleaving study (need SR in top-up mode)

Sun/Shang

Stored Beam & Injection

1600-1900

ID7 vertical aperture measurement

Emery/Sun

Stored Beam & Injection

1900-2200

ID feedforward reproducibility

Emery

Stored Beam & Injection

2200-2400

Orbit Switch

Sajaev

Stored Beam & Injection


Wednesday, November 1, 2017



0000-0200

Orbit Switch

Sajaev

Stored Beam & Injection

0200-0600

Slow freq beam motion study

Sajaev

Stored Beam & Injection

0630-0800

Prepare for User beam

OPS

Stored Beam & Injection