Machine Studies

Draft Schedule for Run03-6, 2017

November 6th 0800 – November 7th 0800



Time

Descriptions

Studiers

SR Status


Monday, November 6, 2017



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0930-1030

Switch PAR RF-1 systems

RF Group

No Injection

0930-1130

Add ULM112 ioc iocbramp (for B:SD-U)

Fors, Stevens

No Injection

0930-1130

Swap our quadrupole converters Zone F

Ackley

No Beam

0930-1130

Mod SR Interlock racks

Vargas

No Beam

0930-1130

Upgrade GesADC board in Linac

Donkers

No Injection

0930-1330

Test Vector Detector Module setup

T. Smith

Stored Beam & Injection

0930-1430

Troubleshoot RF-5 crowbar trips

RF Group

No Injection

1000-1100

Replace wireless access point

Westbrook

Access Linac

1000-1100

Upgrade helios file server

Thurman

Limited Injection

1130-1430

PAR high charge study

Harkay

Limited Injection

1430-1500

Recover storage ring with hybrid fill (all controllaws running, make save with gaps open)

OPS

Stored beam & injection

1500-1700

topup interleaving studies (need storage ring in topup), reboot of siocileave

Yin-e Sun, Pietryla, Shang

Stored beam & injection

1700-2000

pinger/single bunch measurements in sector 27

Sereno/Brill

Stored beam & injection

2000-2300

7-ID aperature

Emery

Stored beam & injection

2300-2400

ID feedforward, limits to accuracy

Emery

Stored beam & injection


Tuesday, November 7, 2017



0000-0200

ID feedforward, limits to accuracy

Emery

Stored beam & injection

0200-0400

SR training (2300-0700)

Smith/Fystro

Stored Beam & Injection

0400-0700

low-frequency beam motion measurement

Sajaev

Stored Beam & injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection