Machine Studies
Draft Schedule for Run03-6, 2017
November 6th 0800 – November 7th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, November 6, 2017 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0930-1030 |
Switch PAR RF-1 systems |
RF Group |
No Injection |
0930-1130 |
Add ULM112 ioc iocbramp (for B:SD-U) |
Fors, Stevens |
No Injection |
0930-1130 |
Swap our quadrupole converters Zone F |
Ackley |
No Beam |
0930-1130 |
Mod SR Interlock racks |
Vargas |
No Beam |
0930-1130 |
Upgrade GesADC board in Linac |
Donkers |
No Injection |
0930-1330 |
Test Vector Detector Module setup |
T. Smith |
Stored Beam & Injection |
0930-1430 |
Troubleshoot RF-5 crowbar trips |
RF Group |
No Injection |
1000-1100 |
Replace wireless access point |
Westbrook |
Access Linac |
1000-1100 |
Upgrade helios file server |
Thurman |
Limited Injection |
1130-1430 |
PAR high charge study |
Harkay |
Limited Injection |
1430-1500 |
Recover storage ring with hybrid fill (all controllaws running, make save with gaps open) |
OPS |
Stored beam & injection |
1500-1700 |
topup interleaving studies (need storage ring in topup), reboot of siocileave |
Yin-e Sun, Pietryla, Shang |
Stored beam & injection |
1700-2000 |
pinger/single bunch measurements in sector 27 |
Sereno/Brill |
Stored beam & injection |
2000-2300 |
7-ID aperature |
Emery |
Stored beam & injection |
2300-2400 |
ID feedforward, limits to accuracy |
Emery |
Stored beam & injection |
|
Tuesday, November 7, 2017 |
|
|
0000-0200 |
ID feedforward, limits to accuracy |
Emery |
Stored beam & injection |
0200-0400 |
SR training (2300-0700) |
Smith/Fystro |
Stored Beam & Injection |
0400-0700 |
low-frequency beam motion measurement |
Sajaev |
Stored Beam & injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |