Machine Studies

Draft Schedule for Run03-7, 2017

November 13th 0800 – November 14th 0800



Time

Descriptions

Studiers

SR Status


Monday, November 13, 2017



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0900

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0930-1030

Trace 9.77MHz source point

Laird, Yao

Limited Injection

0930-1030

Test B:IK PSCU synchronization (reboot iocbvp1)

Fors

Limited Injection

0930-1130

Swap out SR Zone A sextupole converters

Ackley

No Beam

0930-1130

Modify SR interlock racks

Vargas

No Beam

0930-1130

Upgrade GesADC board in PAR GESPACS

Donkers

No Injection

0930-1130

Replace 15V control power for S34:35 R1

Jordan

No Beam

0930-1130

Replace fiber cable for PC Gun BPM trigger

Pietryla

Limited Injection

0930-1130

Move PAR RF-1 output filter

RF Group

No Injection

0930-1130

Install LLRF cabling for APS-U inPAR

Berenc

Limited Injection

0930-1130

Swap and validate LTP BESOCM

Keane

Limited Injection

0930-1330

9BM water leak repair/15BM PS2 removal

Theres/MOM/Martens

Access Zone B

1000-1100

Investigate possible water leaks

Wright

Access Zone C & D

1030-1130

Correct Booster ramps voltage reference waveform

Yao, Shang

Limited Injection

1130-1330

Linac PEM tool refinement

Pasky/Soliday

No Injection

1330-1530

Test Booster local steering

Yao/Shang

Booster Beam

1530-2130

PAR high charge studies

Harkay/Yao/ Calvey/Dooling

Limited Injection

1400-1800

Slow beam motion measurement

Sajaev

Limited Injection

2130-2330

Topup interleaving study

Sun/Shang/ Keane

Stored Beam & Injection

2330-2400

Orbit switch

Xiao

Stored Beam & Injection


Tuesday, November 14, 2017



0000-0330

Orbit switch

Xiao

Stored Beam & Injection

0330-0630

ID feedforward

Emery

Stored Beam & Injection

0630-0800

Prepare for User beam

OPS

Stored Beam & Injection