Machine Studies
Draft Schedule for Run03-9, 2017
December 4th 0800 – December 5th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, December 4, 2017 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0930-1030 |
Upgrade Booster RF power monitor |
DiMonte |
No Injection |
0930-1130 |
Modify Zone F interlock racks |
Vargas |
No Beam |
0930-1130 |
Upgrade GesADC for Booster Gespacs |
Donkers |
Limited Injection |
0930-1130 |
Swap quadrupole converters Zone E |
Ackley |
No Beam |
0930-1130 |
Swap and validate LTP BESOCM |
Keane |
No Injection |
0930-1130 |
Invesitgate PC Gun/Laser timing jitter |
Pietryla |
Limited Injection |
0930-1130 |
Test B:SD-U/SD switching pem |
Yao/Shang |
No Beam |
1100-1130 |
SR requalification (part 1) |
Bogdan/ Schroeder |
No Beam |
1130-1200 |
Recover SR beam/make open gaps saves |
OPS |
Stored Beam & Injection |
1200-1300 |
SR requalification (part 2) |
Bogdan/ Schroeder |
Stored Beam & Injection |
1300-1400 |
Measure Quad hysteresis with tune measurement |
Emery |
Stored Beam & Injection |
1300-1500 |
Interleaving topup study |
Sun/Shang |
Stored Beam & Injection |
1500-2000 |
ID4 local impedance measurement |
Sajaev |
Stored Beam & Injection |
2000-2400 |
Orbit Switch |
Xiao |
Stored Beam & Injection |
|
Tuesday, December 5, 2017 |
|
|
0000-0600 |
XBPM noise study |
Sereno/Yang/ Hahne |
Stored Beam & Injection |
0600-0700 |
SR requalification (23:00-07:00) |
Angel/LaBuda |
Stored Beam & Injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |