Pre-Studies Schedule for Run1-0, 2018
January 19th 0800 – January 23rd 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Friday, January 19, 2018 (pre-studies) |
|
|
0800-1000 |
MPS validations, final checkout |
Smith, OPS |
No Beam |
1000-1200 |
Establish injection |
Emery, Schroeder |
Stored beam & injection |
1200-1300 |
BPLD validation for 7-ID <25 mA (requires HSCU to be on at 0A) |
Erwin |
Stored beam & injection |
1300-1500 |
Aperture scan, HSCU chamber, 15 mA in multiple bunches |
Emery, Sajaev |
Stored beam & injection |
1500-1900 |
Scan beam ID7 in x&y, 24 bunches < 25 mA. |
Yipeng Sun |
Stored beam & injection |
1600-1800 |
Realign HSCU chamber if needed |
Jasma, et al |
Access Zone A |
1900-2400 |
Rf conditioning, 115 mA, 24 bunches. Pause for 1 hr at 100mA. Measure x,y tunes at intervals of 5 mA. No P0 FB. |
OPS |
Stored beam & injection |
|
Saturday, January 20, 2018 (pre-studies) |
|
|
0000-1200 |
Rf conditioning, 115 mA, 24 bunches. Pause for 1 hr at 100mA. Measure x,y tunes at intervals of 5 mA. No P0 FB. |
OPS |
Stored beam & injection |
1200-1400 |
HSCU powered 102 mA 24 bunches Emery |
Emery |
Stored beam & injection |
1400-1500 |
Beam dump |
Emery, Yipeng Sun |
Stored beam & injection |
1500-1800 |
102 mA 324 bunches |
Operators |
Stored beam & injection |
1800-2400 |
OPEN (Maintain 100mA if no studies) |
|
|
|
Sunday, January 21, 2018 (pre-studies) |
|
|
0000-0900 |
OPEN (Maintain 100mA if no studies) |
|
|
0900-1200 |
Field integrals 324 bunches 102mA |
Emery, Yipeng Sun |
Stored beam & injection |
1200-1400 |
Quench test |
Harkay, Emery, Yipeng Sun |
Stored beam & injection |
1400-2400 |
OPEN (Maintain 100mA if no studies) |
|
|
|
Monday, January 22, 2018 (pre-studies) |
|
|
0000-0800 |
OPEN (Maintain 100mA if no studies) |
|
|
0800-1400 |
Set up injectors for 425MeV |
Yine Sun, Pasky, Harkay |
Occ. injection possible |
0800-1200 |
Initial BPM checkout |
Sereno |
Stored beam & occ. inj. |
1200-1400 |
Set-up pinhole camera |
Yang |
Stored beam & occ. inj. |
1400-1800 |
Injection improvement for normal lattice |
Emery |
Stored beam & injection |
1800-2400 |
OPEN (maintain 100mA if no studies) |
|
|
|
Tuesday, January 23, 2018 |
|
|
0000-0800 |
OPEN (maintain 100mA if no studies) |
|
|
0800 |
Regular studies period starts |
|
|