Machine Intervention
Schedule for Run1-0, 2018
(includes Pre-Studies)
January 19th 0800 – January 30th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Friday, January 19, 2018 (pre-studies) |
|
|
0800-1000 |
MPS validations, final checkout |
Smith, OPS |
No Beam |
1000-1200 |
Establish injection |
Emery, Schroeder |
Stored beam & injection |
1200-1300 |
BPLD validation for 7-ID <25 mA (requires HSCU to be on at 0A) |
Erwin |
Stored beam & injection |
1300-1500 |
Aperture scan, HSCU chamber, 15 mA in multiple bunches |
Emery, Sajaev |
Stored beam & injection |
1500-1900 |
Scan beam ID7 in x&y, 24 bunches < 25 mA. |
Yipeng Sun |
Stored beam & injection |
1600-1800 |
Realign HSCU chamber if needed |
Jasma, et al |
Access Zone A |
1900-2400 |
Rf conditioning, 115 mA, 24 bunches. Pause for 1 hr at 100mA. Measure x,y tunes at intervals of 5 mA. No P0 FB. |
OPS |
Stored beam & injection |
|
Saturday, January 20, 2018 (pre-studies) |
|
|
0000-1200 |
Rf conditioning, 115 mA, 24 bunches. Pause for 1 hr at 100mA. Measure x,y tunes at intervals of 5 mA. No P0 FB. |
OPS |
Stored beam & injection |
1200-1400 |
HSCU powered 102 mA 24 bunches Emery |
Emery |
Stored beam & injection |
1400-1500 |
Beam dump |
Emery, Yipeng Sun |
Stored beam & injection |
1500-1800 |
102 mA 324 bunches |
Operators |
Stored beam & injection |
1800-2400 |
OPEN (Maintain 100mA if no studies) |
|
|
|
Sunday, January 21, 2018 (pre-studies) |
|
|
0000-0900 |
OPEN (Maintain 100mA if no studies) |
|
|
0900-1200 |
Field integrals 324 bunches 102mA |
Emery, Yipeng Sun |
Stored beam & injection |
1200-1400 |
Quench test |
Harkay, Emery, Yipeng Sun |
Stored beam & injection |
1400-2400 |
OPEN (Maintain 100mA if no studies) |
|
|
|
Monday, January 22, 2018 (pre-studies) |
|
|
0000-0800 |
OPEN (Maintain 100mA if no studies) |
|
|
0800-1400 |
Set up injectors for 425MeV |
Yine Sun, Pasky, Harkay |
Occ. injection possible |
0800-1200 |
Initial BPM checkout |
Sereno |
Stored beam & occ. inj. |
1200-1400 |
Initial pinhole camera set-up |
Yang |
Stored beam & occ. inj. |
1400-1600 |
Check motion with 0.5mA and no VC water. |
Emery |
Stored beam & injection |
1600-1800 |
Check noise on trims and P0 initial feedback setup |
Emery |
Stored beam & injection |
1800-2100 |
ID7 aperature measurement |
Yipeng Sun |
Stored beam & injection |
2100-2400 |
Initial lattice set-up |
Sajaev |
Stored Beam & injection |
|
Tuesday, January 23, 2018 |
|
|
0000-0800 |
OPEN (maintain 100mA if no studies) |
|
|
0800-1200 |
BPLD validations |
Hahne |
Stored beam & injection |
1200-1600 |
X-ray BPM Sanity check |
Hahne |
Stored beam & injection |
1600-2100 |
Injection tune-up |
Sajaev |
Stored beam & injection |
2100-2300 |
BPM offset measurement |
Xiao/Emery |
Stored beam & injection |
2300-2400 |
Orbit recovery |
Xiao/Emery |
Stored beam & injection |
|
Wednesday, January 24, 2018 |
|
|
0000-0200 |
Orbit recovery |
Xiao/Emery |
Stored beam & injection |
0200-0800 |
425 MeV tuneup and high-charge measurements |
Harkay, Calvey, Yao |
Occ. injection possible |
0800-0900 |
Interleaving top-up checkout (SR needs to be available for top-up |
Yine Sun, Shang |
Stored beam & injection |
0900-1100 |
Interleaving procedure testing/training |
Yine Sun, Pasky, etc. |
Stored beam & injection |
1100-1600 |
Better steering for HSCU, 7BM |
Emery |
Stored beam & injection |
1600-1900 |
Accumulation limit for hybrid mode |
Emery |
Stored beam & injection |
1900-2300 |
ID4 aperature measurement |
Emery |
Stored beam & injection |
2300-2400 |
PAR studies |
Calvey |
No injection |
|
Thursday, January 25, 2017 |
|
|
0000-0300 |
PAR studies (continued) |
Calvey |
No injection |
0300-0800 |
OPEN |
|
|
0800-1100 |
BESOCM and Linac waveguide switching validation |
Pietryla, Pasky |
No Injection |
0800-1100 |
Continue P.S. testing |
Iftikhar |
No beam |
0800-1200 |
Booster SDU study |
Yao, Shang, Puttkammer |
Limited injection |
0800-1400 |
RF3 supplying Booster waveguide switch to RF3/RF4 |
RF Group |
Limited injection |
0800-1100 |
S6 SCU training |
Kasa |
No beam |
1100-1200 |
Restore S6C:V1 P.S. |
Puttkammer |
No beam |
1100-1300 |
SF6 system maintenance |
Michalek |
Limited injection |
1400-2000 |
425-MeV tuneup and high-charge measurements (fill ring before) |
Harkay, Calvey, Yao |
Limited injection |
1400-2000 |
S7 HSCU commissioning at beamline (shutter permit needed) |
S7 (Walko) |
Stored beam |
2000-2400 |
Verify 6GeV SR setup |
Emery |
Stored beam & injection |
|
Friday, January 26, 2018 |
|
|
0000-0700 |
Comissioning simulation testing (cont.) |
Sajaev |
Stored beam & injection |
0700-1100 |
Laser alignment |
Dooling |
Linac Access |
1100-1300 |
PC gun bean in linac checkout (including waveguide switching) |
Yine Sun, Dooling |
Stored beam |
1300-1700 |
S7 HSCU commissioning at beamline with Top-up (shutter permit needed) |
S7 beamline (Walko] |
Stored beam & injection |
1700-2100 |
Booster steering studies |
Yao |
Limited injection |
2100-2400 |
425MeV tuneup and high charge studies |
Harkay |
Infrequent injection possible |
|
Saturday, January 27, 2018 |
|
|
0000-0100 |
425MeV tuneup and high charge studies (continued) |
Harkay |
Infrequent injection possible |
0100-0800 |
OPEN |
|
|
0800-1600 |
CPU correction |
Xiao/Emery |
Stored beam & injection |
1600-2400 |
Top-up verification |
OPS |
|
|
Sunday, January 28, 2018 |
|
|
0000-0800 |
Top-up verification |
OPS |
|
0800-1600 |
IEX correction |
Xiao/Emery |
Stored beam & injection |
1600-2400 |
Top-up verification |
OPS |
Stored beam & injection |
|
Monday, January 29, 2017 |
|
|
0000-0700 |
Top-up verification |
OPS |
Stored beam & injection |
0700-1500 |
PAR RF1 absorptive filter test |
Goel/Madden, Yao, Harkay, Calvey |
Stored beam |
0800-1200 |
Access into Zone A & F for VC chamber vibration measurements and installing shims |
Emery, Preissner |
No beam |
1500-1800 |
Final pinhole camera set-up and bunch purity measurement set-up |
Yang |
Stored beam & injection |
1800-1900 |
Final LIST phase tuning for bunch purity and PAR FF table setup (requires frequent injections & dumps into the SR) |
Harkay |
Stored beam & injection |
1900-2400 |
PC Gun Studies |
Yine Sun |
Occasional injection available |
|
Tuesday, January 30, 2017 |
|
|
0000-0100 |
OPEN |
|
|
0100-0630 |
Final orbit checkout |
Xiao/Emery |
Stored beam & injection |
0630-0800 |
Prepare for User Operations (24 singlets) |
OPS |
Stored beam & injection |