Draft Schedule for Run01-10, 2018
April 2nd 0800 – April 3 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, April 2, 2018 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Sereno |
Stored Beam & Injection |
0930-1130 |
Upgrade iocbbpm |
Pietryla |
Limited Injection |
0930-1130 |
Swap quad converters |
Ackley/Vargas |
No Beam |
0930-1130 |
Measure the converter DC bus voltage |
Wang |
No beam |
0930-1130 |
Test a Modified Dac/Regulator board in a Linac L2 Corrector power supply |
Hillman |
No injection |
0930-1130 |
measure real time feedback DSP processing delay. |
S. Xu |
No beam |
1000-1200 |
Replace blower |
MOM group |
Access Zone F |
1200-1230 |
Recover and store beam |
OPS |
Stored Beam & injection |
1230-1400 |
SR training (07-15) |
E. Smith |
Stored Beam & Injection |
1400-1800 |
LTP and PTB CM studies at 1Hz/2Hz and high charge |
Harkay, Keane |
Occasional injection possible |
1400-1600 |
look at signals out of the Pendland card in sector 40 using Louis RTFB matrix |
Sereno |
Stored beam |
1800-2200 |
BPM sums signal calibration |
Xiao |
Stored beam & Injection |
2200-2400 |
Characterization of HSCU by beamline personnel with MCR performing steering (Shutter permit needed) |
Walko, OPS |
Stored beam & injection |
|
Tuesday, April 3, 2018 |
|
|
0000-0200 |
Characterization of HSCU by beamline personnel with MCR performing steering (Shutter permit needed) (continued) |
Walko, OPS |
Stored beam & injection |
0200-0700 |
OPEN |
|
|
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |