Machine Studies

Draft Schedule for Run01-10, 2018

April 2nd 0800 – April 3 0800



Time

Descriptions

Studiers

SR Status


Monday, April 2, 2018



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Sereno

Stored Beam & Injection

0930-1130

Upgrade iocbbpm

Pietryla

Limited Injection

0930-1130

Swap quad converters

Ackley/Vargas

No Beam

0930-1130

Measure the converter DC bus voltage

Wang

No beam

0930-1130

Test a Modified Dac/Regulator board in a Linac L2 Corrector power supply

Hillman

No injection

0930-1130

measure real time feedback DSP processing delay.

S. Xu

No beam

1000-1200

Replace blower

MOM group

Access Zone F

1200-1230

Recover and store beam

OPS

Stored Beam & injection

1230-1400

SR training (07-15)

E. Smith

Stored Beam & Injection

1400-1800

LTP and PTB CM studies at 1Hz/2Hz and high charge

Harkay, Keane

Occasional injection possible

1400-1600

look at signals out of the Pendland card in sector 40 using Louis RTFB matrix

Sereno

Stored beam

1800-2200

BPM sums signal calibration

Xiao

Stored beam & Injection

2200-2400

Characterization of HSCU by beamline personnel with MCR performing steering (Shutter permit needed)

Walko, OPS

Stored beam & injection


Tuesday, April 3, 2018



0000-0200

Characterization of HSCU by beamline personnel with MCR performing steering (Shutter permit needed) (continued)

Walko, OPS

Stored beam & injection

0200-0700

OPEN



0700-0800

Prepare for User beam

OPS

Stored Beam & Injection