Machine Studies
Draft Schedule for Run01-2, 2018
February 5th 0800 – February 6th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, February 5, 2018 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0930-1130 |
Replace SR Raw DC output meters in S18:19 |
Vargas |
No Beam |
0930-1130 |
Replace dump resistor in S26/27 T2 |
Jordan |
No Beam |
0930-1230 |
PCG studies |
|
|
1000-1100 |
Investigate IR detectors on S37/38 cavities |
RF Group |
Access Zone F |
1000-1200 |
Install shims on Zone F quadrupole |
Emery/MOM |
Access Zone F |
1100-1200 |
RF waveguide switch to RF-2 |
RF Group |
No Beam |
1230-1300 |
Lock out laser and switch water from the PCG to ITS gun |
Dooling/ Pasky/Wright |
No impact |
|
|
|
|
1300-1600 |
Troubleshoot trips at SRF-2 |
RF Group |
Stored Beam & Injection |
1300-1400 |
Check orbit motion after Zone F Access |
Emery |
Stored beam |
1600-1800 |
XBPM troubleshooting and alignment |
Sereno/Hahne |
Stored beam & occ. inj. |
1600-1700 |
lower L4 RF and re-tune linac for 425 MeV operation |
Yine Sun |
Occ. inj possible |
1600-2000 |
Test new electronics for S27 Grid XBPM |
Yang |
Stored beam & occ. inj. |
2000-2200 |
SR training (15-23) |
Smith/LaBuda |
Stored Beam & Injection |
2200-2400 |
high-charge injector studies |
Harkay/Calvey |
Occ. inj. possible |
|
Wednesday, February 6, 2018 |
|
|
0000-0300 |
high-charge injector studies |
Harkay/Calvey |
Occ. inj. possible |
0300-0700 |
BPM offset measurement & Check accuracy of BPM offset measurements due to various improvements |
Xiao |
Stored beam & occ. injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |