Machine Studies
Draft Schedule for Run01-4, 2018
February 19th 0800 – February 20th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, February 19, 2018 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0820 |
Make adjustment to circulator TCU for RF2 and monitor RF2 during gap scans |
Goel |
Stored Beam & injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Sereno |
Stored Beam & Injection |
0930-1030 |
Swap out S13B:Q5 |
Vargas |
No Beam |
0930-1130 |
Swap out quadrupoles |
Ackley |
No Beam |
0930-1130 |
Test S2/3 raw DB changes |
Hillman/Xu |
No Beam |
0930-1130 |
Replace F1 LED in SR IK4 |
Vanis |
No Beam |
0930-1100 |
Install Linac RF DB changes |
Pietryla |
No Injection |
0930-1130 |
Test run HSCU |
Smith |
No Beam |
1100-1200 |
Measure Booster dispersion for LOCO study. Need to change rf frequency. |
Yao |
No beam |
1200-1300 |
Test FFT software on iocbbpm3 |
Lenkszus |
Limited Injection |
1300-1500 |
Continue Booster injection controllaw setup after Lenkszus study |
Yao |
Occasional inj. possible |
1300-1500 |
Make adjustments for RF2 with beam (may continue parasitically during the Sereno's study) |
Goel |
Stored beam & occ. injiction |
1500-1830 |
XBPM alignment and gap scans |
Sereno |
Stored beam & injection |
1830-2130 |
Injection efficiency dependence on BTS energy |
Emery |
Stored beam & injection |
2130-2400 |
6 GeV lattice |
Emery, Xiao |
Stored beam & injection |
|
Tuesday, February 20, 2018 |
|
|
2400-0100 |
6 GeV lattice (continued) |
Emery, Xiao |
Stored beam & injection |
0100-0400 |
ID 4 impedance measurement |
Sajaev |
Stored Beam & injection |
0400-0700 |
Commissioning simulation |
Sajaev |
Stored Beam & injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |