Machine Studies
Draft Schedule for Run02-1, 2018
May 22nd 0800 – May 30th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, May 22, 2018 |
|
|
0800-1200 |
RF conditioning with beam |
OPS |
Stored Beam & Injection |
0800-1200 |
BPM RTFB and datapool system checkout |
Sereno |
Stored Beam & Injection |
1200-1600 |
BPLD validations |
Lester/Sereno |
Stored Beam & Injection |
1600-2000 |
X-ray BPM sanity check |
Sereno |
Stored Beam & Injection |
2000-2400 |
Lattice set up |
Sajaev |
Stored Beam & Injection |
|
Wednesday, May 23, 2018 |
|
|
0000-0100 |
Lattice set up |
Sajaev |
Stored Beam & Injection |
0100-0600 |
Orbit recovery |
Xiao |
Stored Beam & Injection |
0600-0800 |
Open |
|
|
0800-1400 |
|
Sereno et al |
Stored beam |
1030-1400 |
Changes to PEMs used to move gaps |
Shang/Schroeder |
Stored beam |
0800-1400 |
Linac/PAR/Booster at 450 MeV |
Sun/Pasky/Yao/Harkay/Calvey |
No Injection |
1400-1800 |
6 ID GRID XBPM commissioning |
Yang |
Stored Beam & Injection |
1800-2400 |
Unified orbit feedback |
Sereno, et al |
Stored Beam |
|
Thursday, May 24, 2018 |
|
|
0000-0400 |
Unified orbit feedback |
Sereno, et al |
Stored Beam |
0400-0800 |
Commissioning script work |
Sajaev |
Stored Beam & Injection |
0800-0900 |
Validate LINAC BESOCM |
Keane |
Limited Injection |
0800-1100 |
Measure RTFB DSP processing delay |
Xu, Paskvan |
No beam |
0900-1100 |
Validate Interleaving Trigger Control Chassis |
Pietryla |
Limited Injection |
0830-1100 |
Check the cabling for the flow meter interlock on Sector 37 hybrid load 3 |
Goel |
No Beam |
1000-1100 |
RF waveguide switch |
RF Group |
No Beam |
1100-1500 |
Linac waveguide switch testing and RG1 checkout |
Sun |
No Beam |
1500-2100 |
450 MeV injector optimization |
Yao, Harkay, Sun, Calvey |
Stored Beam & Injection |
2100-2400 |
Comissioning script work |
Sajaev |
Stored Beam & injection |
|
Friday, May 25, 2018 |
|
|
0000-0700 |
Commissioning script work (cont.) |
Sajaev |
Stored Beam & Injection |
0700 |
Fill SR with 324 singlets to 102mA for HP survey to be done in the afternoon |
OPS |
Stored Beam & Injection |
0700-1300 |
PAR high charge study in 450MeV |
Harkay/Calvey/Berenc |
No injection |
1300-1600 |
Return 425MeV injector |
Sun/Pasky/Yao/Harkay |
No injection |
1600-1800 |
PEM testing with beam |
Schroeder/Shang |
Stored Beam & Injection |
1800-2400 |
IEX checkout |
Xiao |
Stored Beam & Injection |
|
Saturday, May 26, 2018 |
|
|
0000-0200 |
IEX checkout |
Xiao |
Stored Beam & Injection |
0200-0900 |
Open |
|
|
0900-1600 |
PAR high charge studie in 450MeV |
Harkay/Calvey/Berenc |
No injection |
1600-2200 |
CPU checkout |
Xiao |
Stored Beam & Injection |
2200-2400 |
Topup validation |
OPS |
Stored Beam & Injection |
|
Sunday, May 27, 2018 |
|
|
0000-0800 |
Topup validation |
OPS |
Stored Beam & Injection |
0800-1600 |
27-ID XBPM2, and 6-ID XBPM1 commissioning 24 singlets top-up(shutter permit needed) |
Yang |
Stored beam & injection |
1600-2200 |
BTS study |
Xiao |
Stored Beam & Injection |
2200-2400 |
Topup validation |
OPS |
Stored Beam & Injection |
|
Monday, May 28, 2018 |
|
|
0000-0900 |
Topup validation |
OPS |
Stored Beam & Injection |
0900-1600 |
Triple RHB lattice study |
Sun |
Stored Beam & Injection |
1600-1900 |
ID4 aperture checkout |
Emery |
Stored Beam & Injection |
1900-2400 |
6 GeV checkout |
Emery |
Stored Beam & Injection |
|
Tuesday, May 29, 2018 |
|
|
0000 |
Fill 324 singlets for Yang's study at 0200 |
OPS |
Stored beam & injection |
0000-0800 |
450MeV High Charge study |
Harkay |
Limited injection |
0200-0800 |
6-ID GRID-XBPM Calibration |
Yang |
Stored beam |
0800-1200 |
Pinhole camera and bunch purity setup |
Yang |
Stored Beam & Injection |
1200-1600 |
Final lattice setup |
Sajaev |
Stored Beam & Injection |
1600-2000 |
Booster tune study with Lee Teng intern |
Calvey |
Limited injection |
2000-2400 |
Final orbit setup |
Xiao |
Stored Beam & Injection |
|
Wednesday, May 30, 2018 |
|
|
0000-0200 |
Abort kicker checkout |
Harkay |
Stored Beam & Injection |
0200-0600 |
PAR RF System Manager file set-up |
Harkay |
Limited injection |
0600-0800 |
Prepare for user Operations (24 singlets – Top-Up) |
Ops |
Stored Beam & Injection |