Draft Schedule for Run02-10, 2018
July 30th 0800 - July 31th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, July 30, 2018 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Hahne |
Stored Beam & Injection |
0930-1000 |
Update Linac database record |
Pietryla |
Stored Beam & Injection |
0930-1030 |
RF waveguide switch to RF2 |
RF Group |
No Beam |
0930-1130 |
Take internal measurements of IK4 |
Abid |
No Beam |
0930-1130 |
SR Septum IS1 power supply testing |
Deriy |
No Beam |
0930-1130 |
Install new SR Quad control PS in Zone A |
Vargas |
No Beam |
1000-1100 |
Test PAR rf pem |
Harkay/ Soliday |
No Beam |
0930-1130 |
Upgrade iocbbpm3 |
Pietryla |
No Injection |
0930-1330 |
Validate 1-30Hz besocm |
Keane |
No Injection |
1330-1430 |
Adjusting PAR fundamental rf and test SR injection |
Harkay/Smith |
Stored Beam & Injection |
1430-1830 |
S27 FBC closed loop RM measurement and orbit feedback model benchmarking |
Sereno et al. |
Stored Beam & Injection |
1830-2130 |
Booster tune studies |
Calvey/Xu |
Occasional Injection |
1830-2030 |
Test TFB updated system |
Yao/Shang/ Dimonte |
Occasional Injection |
2130-2400 |
27-ID XBPM2 calibration experiment |
Yang |
Stored Beam & Injection |
|
Tuesday, July 31, 2018 |
|
|
0000-0300 |
27-ID XBPM2 calibration experiment |
Yang |
Stored Beam & Injection |
0300-0700 |
RHB in ID25 |
Emery |
Stored Beam & Injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |