Machine Studies

Draft Schedule for Run02-5, 2018

June 25th 0800 - June 27th 0800



Time

Descriptions

Studiers

SR Status


Monday, June 25, 2018



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Hahne

Stored Beam & Injection

0930-1000

Switch over DI pumps 401, 501, & 908

Wright

No Beam/SRRF off

0930-1030

Reboot ioclic(1-6)

Stevens

Limited Injection

0930-1030

Replace iocs40fb crate

Smith

No Beam

0930-1130

Upgrade EPICS on iocbbpm3

Pietryla

Limited Injection

0930-1130

Modify the Dump Resistor Assembly in SR Raw T2 in S36:37

Vargas

No Beam

1000-1200

RTFB timing measurements/check out iocs40fb

Xu

No Beam

1000-1400

PAR chromaticity measurements/adjustments

Yao/Harkay/Shang

No Beam

1400-1600

SR recovery + P0 setup for Hybrid

Yao

Stored Beam & Injection

1600-1900

Turn-by-turn motion benchmarking

Sajaev

Stored Beam & Injection

1900-2300

Continue HSCU beam line commissioning (7-ID shutter permit required)

User/OPS

Stored Beam & Injection

2300-2400

Orbit switch

Xiao

Stored Beam & Injection


Tuesday, June 26, 2018



0000-0300

Orbit switch

Xiao

Stored Beam & Injection

0300-0500

BTS line measurements

Xiao

Stored Beam & Injection

0500-0700

PAR operator training (23-07)

Bogdan/Davis

Stored Beam & Injection

0700-1200

Commissioning script test

Sajaev

Stored Beam & Injection

1200-1700

S27 closed loop response measurements and feedback

Kallakuri/Sereno/Brill/Carwardine

Stored Beam & Injection

1700-2300

6 ID P1 and 27 ID XBPM2 GRID study

(shutter permit required)

Yang/Wootton/Sereno

Stored Beam & Injection

2300-2400

PAR operator training (23-07)

Bogdan/Davis

Stored Beam & Injection


Wednesday, June 27, 2018



0000-0100

PAR operator training (23-07)

Bogdan/Davis

Stored Beam & Injection

0100-0400

SCU1 perturbation measurements (shutter permit required)

Emery/Shastri

Stored Beam & Injection

0400-0630

Open



0630-0800

Prepare for User beam

OPS

Stored Beam & Injection