Machine Studies
Draft Schedule for Run02-5, 2018
June 25th 0800 - June 27th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, June 25, 2018 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Hahne |
Stored Beam & Injection |
0930-1000 |
Switch over DI pumps 401, 501, & 908 |
Wright |
No Beam/SRRF off |
0930-1030 |
Reboot ioclic(1-6) |
Stevens |
Limited Injection |
0930-1030 |
Replace iocs40fb crate |
Smith |
No Beam |
0930-1130 |
Upgrade EPICS on iocbbpm3 |
Pietryla |
Limited Injection |
0930-1130 |
Modify the Dump Resistor Assembly in SR Raw T2 in S36:37 |
Vargas |
No Beam |
1000-1200 |
RTFB timing measurements/check out iocs40fb |
Xu |
No Beam |
1000-1400 |
PAR chromaticity measurements/adjustments |
Yao/Harkay/Shang |
No Beam |
1400-1600 |
SR recovery + P0 setup for Hybrid |
Yao |
Stored Beam & Injection |
1600-1900 |
Turn-by-turn motion benchmarking |
Sajaev |
Stored Beam & Injection |
1900-2300 |
Continue HSCU beam line commissioning (7-ID shutter permit required) |
User/OPS |
Stored Beam & Injection |
2300-2400 |
Orbit switch |
Xiao |
Stored Beam & Injection |
|
Tuesday, June 26, 2018 |
|
|
0000-0300 |
Orbit switch |
Xiao |
Stored Beam & Injection |
0300-0500 |
BTS line measurements |
Xiao |
Stored Beam & Injection |
0500-0700 |
PAR operator training (23-07) |
Bogdan/Davis |
Stored Beam & Injection |
0700-1200 |
Commissioning script test |
Sajaev |
Stored Beam & Injection |
1200-1700 |
S27 closed loop response measurements and feedback |
Kallakuri/Sereno/Brill/Carwardine |
Stored Beam & Injection |
1700-2300 |
6 ID P1 and 27 ID XBPM2 GRID study (shutter permit required) |
Yang/Wootton/Sereno |
Stored Beam & Injection |
2300-2400 |
PAR operator training (23-07) |
Bogdan/Davis |
Stored Beam & Injection |
|
Wednesday, June 27, 2018 |
|
|
0000-0100 |
PAR operator training (23-07) |
Bogdan/Davis |
Stored Beam & Injection |
0100-0400 |
SCU1 perturbation measurements (shutter permit required) |
Emery/Shastri |
Stored Beam & Injection |
0400-0630 |
Open |
|
|
0630-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |