July 9th 0800 – July 10th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, July 9, 2018 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Hahne |
Stored Beam & Injection |
0930-1000 |
Reboot interleaving PS |
PS Group |
No Injection |
0930-1030 |
Waveguide switch from RF-2 to RF-3 |
RF Group |
No Beam |
0930-1030 |
Investigate remote motor control of Booster waveguide phase shifter |
RF Group |
No Injection |
0930-1030 |
Replace power switch on S27/S28 P0 Narrowband BPM chassis |
A. Brill |
No Injection |
1030-1230 |
Troubleshoot Booster Cavity #2 tuner |
RF Group |
No Injection |
1030-1230 |
Determine saturation points for the Linac L2, L4, and L5 klystrons |
RF Group |
Limited Injection |
1230-1300 |
Recovery SR |
OPS |
Stored Beam & Injection |
1300-1700 |
S27 FBC closed loop RM measurement and orbit feedback model benchmarking |
Sereno et al. |
Stored Beam & Injection |
1700-2100 |
Orbit switch |
Xiao |
Stored Beam & Injection |
2100-2400 |
Turn-by-turn benchmarking study |
Sajaev |
Stored Beam & Injection |
|
Tuesday, July 10, 2018 |
|
|
0000-0400 |
Commissioning script work |
Sajaev |
Stored Beam & Injection |
0400-0630 |
27-ID XBPM2 study with shutter permit |
Yang |
Stored Beam & Injection |
0630-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |