Machine Studies

Draft Schedule for Run02-7, 2018

July 9th 0800 – July 10th 0800



Time

Descriptions

Studiers

SR Status


Monday, July 9, 2018



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Hahne

Stored Beam & Injection

0930-1000

Reboot interleaving PS

PS Group

No Injection

0930-1030

Waveguide switch from RF-2 to RF-3

RF Group

No Beam

0930-1030

Investigate remote motor control of Booster waveguide phase shifter

RF Group

No Injection

0930-1030

Replace power switch on S27/S28 P0 Narrowband BPM chassis

A. Brill

No Injection

1030-1230

Troubleshoot Booster Cavity #2 tuner

RF Group

No Injection

1030-1230

Determine saturation points for the Linac L2, L4, and L5 klystrons

RF Group

Limited Injection

1230-1300

Recovery SR

OPS

Stored Beam & Injection

1300-1700

S27 FBC closed loop RM measurement and orbit feedback model benchmarking

Sereno et al.

Stored Beam & Injection

1700-2100

Orbit switch

Xiao

Stored Beam & Injection

2100-2400

Turn-by-turn benchmarking study

Sajaev

Stored Beam & Injection


Tuesday, July 10, 2018



0000-0400

Commissioning script work

Sajaev

Stored Beam & Injection

0400-0630

27-ID XBPM2 study with shutter permit

Yang

Stored Beam & Injection

0630-0800

Prepare for User beam

OPS

Stored Beam & Injection