Machine Studies

Draft Schedule for Run03-1, 2018

September 25 0800 – October 2 0800

Time

Descriptions

Studiers

SR Status


Monday, September 24, 2018

Pre-Studies



0900-1200

Set-up for RF conditioning with beam

Schroedr/Flood/OPS

Stored beam & injection

1200-2400

RF conditioning with beam

OPS

Stored beam & injection

1500-1900

BPM RTFB and datapool check-out (I>50mA)

Sereno

Stored beam & injection

1500-1700

Initial pinhole camera set-up

Yang

Stored beam & injection


Tuesday, September 25, 2018



0000-1200

RF Conditioning with beam (cont)

OPS

Stored beam & injection

0800-1200

BPM RTFB and datapool check-out (I>50mA) -- (Continued is needed)

Sereno

Stored beam & injection

1200-1600

BPLD validations

Hahne/Sereno

Stored beam & injection

1600-2000

X-ray BPM check-out

Hahne

Stored beam & injection

2000-2400

Initial lattice set-up

Sajaev, Xiao

Stored beam & injection


Wednesday, September 26, 2018



0000-0500

BPM offset measurement (S29) & Orbit recovery

Xiao

Stored beam & injection

0500-0900

Injector PEM testing

Fystro

Limited injection

0900-1200

APD and bunch purity optimization setup

Harkay, Yang, Yao

Stored beam & injection

1200-1600

Booster momentum offset variation studies (frequency changes -- no SR beam)

Harkay, Yao

No SR beam

1600-2100

Injector kicker optimization

Yipeng Sun

Stored beam & injection

2100-2400

Injection optimization

Sajaev

Stored beam & injection


Thursday, September 27, 2018



0000-0100

Injection optimization (continued)

Sajaev

Stored beam & injection

0100-0800

IEX checkout

Xiao

Stored beam

0800-0900

RF waveguide switch and make adjustments to RF4

RF Group

No Beam

0800-1130

Update QPC Controller software

Zientek

No injection

0800-1130

Troubleshoot L4 modulator PLC

Meyer

No injection

0830-1130

Laser alignment

Dooling

Access Linac

0830-1130

investigate SR power supply Interlock rack (old acis) drawings/wiring

Puttkammer

No beam

0830-1130

End to end tests

Belcher

SR in CA

0900-0930

Prepare for SR access -- Zone D

OPS

No Beam

0930-1030

Re-route XBPM Grid signals at S27ID Current to Voltage conversion chassis

Blake, Dombrowski

Access Zone D

1130-1230

Recovery SR & injectors

OPS

Stored beam & injection

1230-1630

Commissioning TFB system. Need single bunch and 24 singlet fill

Yao, DiMonte, Shang

Stored beam & injection

1630-1830

complete PAR kicker waveform scan with beam

Yao

Stored beam & injection

1830-2300

Triple RHB lattice

Emery, Yipeng Sun

Stored beam & injection

2300-2400

6GeV setup

Emery

Stored beam & injection


Friday, September 28, 2018



0000-0300

6GeV setup (continued)

Emery

Stored beam & injection

0300-0800

Injection optimization and P0 feedback setup

Sajaev

Stored beam & injection

0800

Fill SR 24 singlets, OC and RTFB running

OPS

Stored beam & injection

0830-0900

Test effect of vibratory plate ompactor with beam

Flood, Russell

Stored beam

0830-1030

Troubleshoot PAR Harmonic #2 circuit breaker

RF Group

No injection

0900-0930

Prepare for Zone D Access

OPS

No SR beam

0915-1300

Update the ion pump controller software at 28 ID and 15 ID. gate valves will need to be closed

Zientek

No SR beam

0930-1530

Remove photodiode assembly in S28 FE GRID X-bpm

Oprondek, Hoyt

Access Zone D

1100-1300

Booster lattice/efficiency optimization

Yao, Yipeng Sun

No injection

1300-1800

Booster momentum offset variation studies. Requires rf source frequency changes

Harkay, Yao

No SR beam

1800-2400

CPU set-up

Xiao

Stored beam


Saturday, September 29, 2018



0000-0900

Top-up verification

OPS

Stored beam & injection

0900-1300

RG1 beam checkout

Yine Sun

Limited injection

1300-1700

PAR digital camera commissioning

Calvey, Yang, Wootton

Limited injection

1700-2400

Top-up verification

OPS

Stored beam & injection


Sunday, September 30, 2018



0000-0900

Top-up verification

OPS

Stored beam & injection

0900-1600

CPU/IEX set-up II if needed

Xiao

Stored beam

1600-2200

28-ID GRID-XBPM initial study

Yang

Stored beam

2200-2400

OPEN




Monday, October 1, 2018



0000-0730

OPEN



0730-0800

Prepare for Booster access

OPS

No injection

0800-0930

Replace blower in inj. cav. #2

Wright

Booster Access

0900-0930

Prepare for SR Zone F access

OPS

No Stored Beam

0930-1100

Replace Blower in S36 RF cavity

Wright

No Stored Beam

1100-1200

Recover SR

OPS

Stored Beam & injection

1200-1600

Final orbit set-up

Xiao, Yipeng Sun

Stored beam & injection

1600-2000

Final lattice setup

Sajaev

Stored beam & injection

2000-2100

Abort kicker set-up

Harkay

Stored beam & injection

2100-2400

6ID GRID XBPM commissioning with controllaw

Yang, Sereno

Stored beam & injection


Tuesday, October 2, 2018



0000-0100

6ID GRID XBPM commissioning with controllaw (continued)

Yang, Sereno

Stored beam & injection

0100-0300

Final pinhole camera set-up/verifiy bunch purity

Yang

Stored beam & injection

0300-0630

Commission script work

Sajaev

Stored beam & injection

0630-0800

Prepare for user Operations (24 singlets – Top-Up)

Ops

Stored Beam & Injection