Machine Studies
Draft Schedule for Run03-3, 2018
October 15th 0800 – October 16th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, October 15, 2018 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Hahne |
Stored Beam & Injection |
0930-1000 |
Reboot interleaving DSPs |
OPS |
Limited Injection |
0930-1030 |
Swap S33A:S4 |
Ackley |
No Beam |
0930-1130 |
Investigate status calc alarms on S12B:Q5 |
Jordan |
No Beam |
0930-1130 |
Replace flow meter at RF4 |
Trento |
No Beam |
0930-1130 |
Test PAR RF-12 phase shifter |
Berenc |
Limited Injection |
0930-1130 |
Linac PEM testing |
Fystro/Soliday |
Limited Injection |
0930-1130 |
Swap quadrupoles in Zone D |
Vargas |
No Beam |
1130-1200 |
Recovery injectors & SR |
OPS |
|
1200-1400 |
Test SR TFB system. Need single bunch or 24 singlet beam |
Yao, DiMonte |
Stored beam & injection |
1400-1600 |
Test Booster on/off momentum pem. Need to ramp rf frequency |
Yao, Shang |
No SR beam |
1600-1700 |
Put back RF bpms repaired or installed |
Sereno |
Stored beam & injection |
1700-1900 |
put in linearization coeffs for BSP-100 and test to see if they make any difference |
Sereno |
Stored beam & injection |
1900-2230 |
LFB. 2 mA bunch and possibly 324 bunches |
Emery, Brill, Wienands, Berenc |
Stored beam & injection |
2230-2400 |
RHB |
Emery, Yipeng Sun |
Stored beam & injection |
|
Tuesday, October 16, 2018 |
|
|
0000-0200 |
RHB |
Emery, Yipeng Sun |
Stored beam & injection |
0200-0530 |
Orbit switch practice |
Xiao, Yipeng Sun |
Stored beam & injection |
0530-0700 |
PAR training (23-07) |
Davis/LaBuda |
Limited Injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |