Machine Studies

Draft Schedule for Run03-3, 2018

October 15th 0800 – October 16th 0800



Time

Descriptions

Studiers

SR Status


Monday, October 15, 2018



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Hahne

Stored Beam & Injection

0930-1000

Reboot interleaving DSPs

OPS

Limited Injection

0930-1030

Swap S33A:S4

Ackley

No Beam

0930-1130

Investigate status calc alarms on S12B:Q5

Jordan

No Beam

0930-1130

Replace flow meter at RF4

Trento

No Beam

0930-1130

Test PAR RF-12 phase shifter

Berenc

Limited Injection

0930-1130

Linac PEM testing

Fystro/Soliday

Limited Injection

0930-1130

Swap quadrupoles in Zone D

Vargas

No Beam

1130-1200

Recovery injectors & SR

OPS


1200-1400

Test SR TFB system. Need single bunch or 24 singlet beam

Yao, DiMonte

Stored beam & injection

1400-1600

Test Booster on/off momentum pem. Need to ramp rf frequency

Yao, Shang

No SR beam

1600-1700

Put back RF bpms repaired or installed

Sereno

Stored beam & injection

1700-1900

put in linearization coeffs for BSP-100 and test to see if they make any difference

Sereno

Stored beam & injection

1900-2230

LFB. 2 mA bunch and possibly 324 bunches

Emery, Brill, Wienands, Berenc

Stored beam & injection

2230-2400

RHB

Emery, Yipeng Sun

Stored beam & injection


Tuesday, October 16, 2018



0000-0200

RHB

Emery, Yipeng Sun

Stored beam & injection

0200-0530

Orbit switch practice

Xiao, Yipeng Sun

Stored beam & injection

0530-0700

PAR training (23-07)

Davis/LaBuda

Limited Injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection