Machine Studies
Draft Schedule for Run01-1, 2019
January 22nd 0800 – January 29th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, January 22, 2019 |
|
|
0000-1200 |
RF Conditioning with beam (cont) |
OPS |
Stored Beam & Injection |
0800-1200 |
Initial pinhole camera set-up |
Yang |
Stored Beam & Injection |
1200-1600 |
BPM RTFB and datapool check-out |
Sereno |
Stored Beam & Injection |
1600-2000 |
BPLD validations |
Hahne/Sereno |
Stored Beam & Injection |
2000-2400 |
X-ray BPM check-out |
Hahne |
Stored Beam & Injection |
|
Wednesday, January 23, 2019 |
|
|
0000-0500 |
Initial lattice set-up |
Sajaev/Xiao |
Stored Beam & Injection |
0500-1000 |
Orbit recovery |
Yipeng Sun |
Stored Beam & Injection |
1000-1100 |
Restore and test PAR harmonic rf timing |
DiMonte/Yao |
Stored Beam & Injection |
1100-1300 |
Test BTS dipole conditioning script |
Harkay/Soliday |
Limited injection |
1300-1700 |
Test TFB feedback system |
DiMonte/Yao |
Stored Beam & Injection |
1700-2400 |
LFB 324 fill, 115 mA |
Emery/Wienands /Kallakuri |
Stored Beam & Injection |
|
Thursday, January 24, 2019 |
|
|
0000-0100 |
LFB 324 fill, 115 mA |
Emery/Wienands /Kallakuri |
Stored Beam & Injection |
0100-0600 |
IEX/CPU perturbation collection, 324 fill (Xiao will give instruction) |
OPS |
Stored Beam & Injection |
0600-1000 |
Test xBPM sanity check script, 324 fill |
Hahne |
Injection at the beginning |
0800-0800 |
Test modifications to iocbbpm3 |
Pietryla |
No Injection |
0800-1000 |
Test switching for BSD-U and BSD |
PS Group |
No Injection |
0800-1400 |
Checking for problem at SR Dipole magnets (if occurs will cancel waveguide switch below) |
PS Group |
Access SR (possibly all zones) |
0800-1400 |
RF3 supplying Booster waveguide switch to RF3/RF4 (will occur if SR access cancelled) |
RF Group |
Limited injection/No Beam |
0830-1130 |
Laser alignment |
Dooling |
Access Linac |
1400-1800 |
Testing zBPM (moved to later because of RF5 problem) |
Sereno/Brill |
Stored Beam & Injection |
1800-2000 |
Verify P0 feedback system after replacement of the clock source |
Yao |
Stored Beam & Injection |
2000-2400 |
Tune PAR for high charge |
Harkay/Calvey |
No injection |
|
Friday, January 25, 2019 |
|
|
0000-0200 |
Tune PAR for high charge |
Harkay/Calvey |
No injection |
0200-0800 |
Testing zBPM |
Sereno/Brill |
Stored Beam & Injection |
0800-1000 |
Setup SF-U operations |
Yao |
No injection |
1000-1400 |
ID corrector feed-forward table check-out |
Emery |
Stored Beam & Injection |
1400-1800 |
BTS FS3 YAG screen testing |
Wootton/Lumpkin |
Limited injection |
1800-2200 |
Booster tuning |
Calvey |
No injection |
2200-2400 |
Open |
|
|
|
Saturday, January 26, 2019 |
|
|
0000-1000 |
Open |
|
|
1000-1800 |
CPU/IEX check-out |
Xiao |
Stored Beam & Injection |
1800-1900 |
Abort Kicker studies |
Harkay |
Stored beam & injection |
1900-2200 |
BTS Dipole Conditioning studies |
Harkay |
Stored beam & injection |
2200-2400 |
Top-up verification |
OPS |
Stored Beam & Injection |
|
Sunday, January 27, 2019 |
|
|
0000-1000 |
Top-up verification |
OPS |
Stored Beam & Injection |
1000-1800 |
6 GeV setup |
Emery |
Stored Beam & Injection |
1800-2400 |
Commissioning script work |
Sajaev |
Stored Beam & Injection |
|
Monday, January 28, 2019 |
|
|
0000-0600 |
Top-up verification |
OPS |
Stored Beam & Injection |
0600-0800 |
Final pinhole camera set-up |
Yang |
Stored Beam & Injection |
0800-1000 |
Bunch purity setup |
Harkay |
Stored Beam & Injection |
1000-1400 |
Setup Booster extraction and BTS for 6 GeV, measure emittance |
Yao/Calvey/Wootton/Lumpkin/Xiao |
No Injection |
1400-2000 |
Vary Booster momentum offset and measure beam (SLM,BDM) and emittance (BTS, BTX) |
Yao/Calvey/Wootton/Dooling/Lumpkin/Xiao |
No Injection |
2000-2400 |
Final orbit set-up |
Yipeng Sun |
Stored Beam & Injection |
|
Tuesday, January 29, 2019 |
|
|
0000-0630 |
Final lattice setup |
Sajaev/Xiao |
Stored Beam & Injection |
0630-0800 |
Prepare for user Operations (24 singlets – Top-Up) |
Ops |
Stored Beam & Injection |