Machine Studies
Draft Schedule for Run01-10, 2019
April 1st 0800 – April 2nd 0800
Time | Descriptions | Studiers | SR Status |
| Monday, April 1, 2019 |
|
|
0800-0810 | Collect XBPM orbit data | OPS | Stored Beam & Injection |
0810-0930 | Gap Scans and update IDGapFF look-up tables | Hahne | Stored Beam & Injection |
0930-1130 | Measure PAR:RF loop gains/ measure PAR:RF1 amp | Berenc | No Beam |
0930-1130 | Troubleshoot S:BM | PS group | No Beam |
0930-1130 | Troubleshoot SF-U ramp swap/sync error | Fors, Yao | Limited Injection |
1000-1100 | Measure H/V/flag scraper | MOM, Harkay | Access PAR |
1000-1100 | Check temperature sensors on SCU1 and do quick inspection of HSCU | Hasse | Access Zone A |
1130-1200 | SR recovery | OPS | Stored Beam & Injection |
1200-1400 | Linac/PAR training (07-15) | Christensen/Berg | Limited Injection |
1400-1600 | Test TFB system | Yao/Dimonte/ Shang | Stored Beam & Injection |
1600-1800 | SR training (15-23) | Davis/LaBuda | Stored Beam & Injection |
1800-2100 | S37-RHB study | Yipeng Sun | Stored Beam & Injection |
2100-2400 | 6 GeV S37 RHB setup (115 mA) | Emery/Sun/Kallakuri/Sajaev | Stored Beam & Injection |
| Tuesday, April 2, 2019 |
|
|
0000-0300 | 6 GeV S37 RHB setup | Emery/Sun/Kallakuri/Sajaev | Stored Beam & Injection |
0300-0700 | Libera Spark, Brilliance+ performance study | Sereno/Brill | Limited Injection |
0300-0500 | PAR training (23-07) | Bogdan/Orne | Stored Beam & Injection |
0700-0800 | Prepare for User beam |
|
|