Draft Schedule for Run01-2, 2019
February 4th 0800 – February 5th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, February 4, 2019 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Hahne |
Stored Beam & Injection |
0930-1030 |
Switch pump 521 to the stand-by pump |
Bechtold |
No Beam |
0930-1130 |
Switch pump P-RF3 to the stand-by pump |
Bechtold |
No Beam |
0930-1130 |
install 180vdc meters for ZVV in SR Raws T1’s in Zone D |
Vargas |
No Beam |
0930-1130 |
Linac RF set-up and measurements |
Cours/Fystro |
No Beam |
0930-1130 |
Switch back to RF-5 providing Booster (if switch does not happen RF5 will be validated for additional work) |
RF Group/OPS |
No Beam |
0930-1130 |
Investigate a Booster Injection tuner issue |
Yoder |
No injection |
0930-1130 |
Check out S:BM regulator |
Wang |
No Beam |
1130-1200 |
Prepare SR (24 fill to establish orbit then 324) |
OPS |
Stored Beam & Injection |
1200-1400 |
Setup pinhole camera |
Yang |
Limited Injection |
1200-1400 |
Linac training (07-15) |
Orne/LaBuda |
Stored Beam & Injection |
1400-1500 |
Testing SROrbitControllaw and Steering Server |
Shang |
Limited Injection |
1400-1600 |
Linac beam tuning |
Yine Sun |
Limited Injection |
1600-1800 |
Test SF-U negative current waveform update |
Yao |
Limited Injection |
1600-2000 |
ID feedforward |
Emery |
Limited Injection |
1800-2000 |
Linac training (15-23) |
Berg/Christensen |
Limited Injection |
2000-2400 |
PAR high-charge tuning |
Calvey/Harkay |
Limited Injection |
|
Tuesday, February 5, 2019 |
|
|
0000-0200 |
PAR high-charge tuning |
Calvey/Harkay |
Limited Injection |
0200-0700 |
Test commissioning script |
Sajaev |
Stored Beam & Injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |