Machine Studies

Draft Schedule for Run01-2, 2019

February 4th 0800 – February 5th 0800



Time

Descriptions

Studiers

SR Status


Monday, February 4, 2019



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Hahne

Stored Beam & Injection

0930-1030

Switch pump 521 to the stand-by pump

Bechtold

No Beam

0930-1130

Switch pump P-RF3 to the stand-by pump

Bechtold

No Beam

0930-1130

install 180vdc meters for ZVV in SR Raws T1’s in Zone D

Vargas

No Beam

0930-1130

Linac RF set-up and measurements

Cours/Fystro

No Beam

0930-1130

Switch back to RF-5 providing Booster (if switch does not happen RF5 will be validated for additional work)

RF Group/OPS

No Beam

0930-1130

Investigate a Booster Injection tuner issue

Yoder

No injection

0930-1130

Check out S:BM regulator

Wang

No Beam

1130-1200

Prepare SR (24 fill to establish orbit then 324)

OPS

Stored Beam & Injection

1200-1400

Setup pinhole camera

Yang

Limited Injection

1200-1400

Linac training (07-15)

Orne/LaBuda

Stored Beam & Injection

1400-1500

Testing SROrbitControllaw and Steering Server

Shang

Limited Injection

1400-1600

Linac beam tuning

Yine Sun

Limited Injection

1600-1800

Test SF-U negative current waveform update

Yao

Limited Injection

1600-2000

ID feedforward

Emery

Limited Injection

1800-2000

Linac training (15-23)

Berg/Christensen

Limited Injection

2000-2400

PAR high-charge tuning

Calvey/Harkay

Limited Injection


Tuesday, February 5, 2019



0000-0200

PAR high-charge tuning

Calvey/Harkay

Limited Injection

0200-0700

Test commissioning script

Sajaev

Stored Beam & Injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection