Machine Studies
Draft Schedule for Run01-3, 2019
February 11th 0800 – February 12th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, February 11, 2019 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Hahne |
Stored Beam & Injection |
0930-1030 |
Cavity sum phase of S36,37 and the RF2 AGC measurements |
Madden |
No Beam |
0930-1130 |
Install ZVV meters in Zone C SR Raws |
Vargas |
No Beam |
0930-1130 |
Investigate SR converters S11 |
Jordan |
No Beam |
0930-1130 |
Continue S:BM investigation |
Abid |
No Beam |
0930-1130 |
Iocbbpm3 upgrade |
Pietryla |
Limited Injection |
1030-1130 |
Replace IR
temperature |
Wright |
Access Zone F |
1030-1230 |
Measure amplitude and phase loop PAR RF |
Berenc |
Limited Injection |
1030-1230 |
Waveguide switch to RF-5 providing Booster |
RF Group/OPS |
No Beam |
1130-1230 |
Install device support S:BM:XDCT3 |
Pietryla |
No Beam |
1230-1400 |
Booster console testing |
Fystro/Davis |
Limited Injection |
1400-1700 |
Test transverse feedback system |
Yao/DiMonte |
Stored Beam & Injection |
1700-2000 |
Gap scan for 5 ID xBPMs |
Sereno |
Stored Beam & Injection |
2000-2400 |
LFB with 324 bunches |
Emery et al. |
Limited Injection |
2000-2300 |
Test and calibrate the PAR fast BLM with the Itech FPGA |
Dooling/Yao/Brill |
Limited Injection |
|
Tuesday, February 12, 2019 |
|
|
0000-0200 |
LFB with 324 bunches |
Emery et al. |
Limited Injection |
0000-0200 |
Linac training (2300-0700) |
Christensen/Berg |
Limited Injection |
0200-0700 |
Test commissioning script |
Sajaev |
Stored Beam & Injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |