Machine Studies

Draft Schedule for Run01-3, 2019

February 11th 0800 – February 12th 0800



Time

Descriptions

Studiers

SR Status


Monday, February 11, 2019



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Hahne

Stored Beam & Injection

0930-1030

Cavity sum phase of S36,37 and the RF2 AGC measurements

Madden

No Beam

0930-1130

Install ZVV meters in Zone C SR Raws

Vargas

No Beam

0930-1130

Investigate SR converters S11

Jordan

No Beam

0930-1130

Continue S:BM investigation

Abid

No Beam

0930-1130

Iocbbpm3 upgrade

Pietryla

Limited Injection

1030-1130

Replace IR temperature
sensor sector 38 cavity 3

Wright

Access Zone F

1030-1230

Measure amplitude and phase loop PAR RF

Berenc

Limited Injection

1030-1230

Waveguide switch to RF-5 providing Booster

RF Group/OPS

No Beam

1130-1230

Install device support S:BM:XDCT3

Pietryla

No Beam

1230-1400

Booster console testing

Fystro/Davis

Limited Injection

1400-1700

Test transverse feedback system

Yao/DiMonte

Stored Beam & Injection

1700-2000

Gap scan for 5 ID xBPMs

Sereno

Stored Beam & Injection

2000-2400

LFB with 324 bunches

Emery et al.

Limited Injection

2000-2300

Test and calibrate the PAR fast BLM with the Itech FPGA

Dooling/Yao/Brill

Limited Injection


Tuesday, February 12, 2019



0000-0200

LFB with 324 bunches

Emery et al.

Limited Injection

0000-0200

Linac training (2300-0700)

Christensen/Berg

Limited Injection

0200-0700

Test commissioning script

Sajaev

Stored Beam & Injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection