Machine Studies

Draft Schedule for Run01-7, 2019

March 11th 0800 – March 13th 0800

 

Time

Descriptions

Studiers

SR Status

 

Monday, March 11, 2019

 

 

0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Hahne

Stored Beam & Injection

0930-1200

Hybrid setup with P0 (I)

Xiao/Yao/Sajaev

Stored Beam & Injection

1200-1800

Commissioning tests

Sajaev

Stored Beam & Injection

1800-2400

LFB measurement, 115 mA

Emery/Wienands/Kallakuri

Limited Injection

1900-2100

Linac training (15-23)

Christensen/Berg

Limited Injection

 

Tuesday, March 12, 2019

 

 

0000-0200

LFB measurement, 115 mA

Emery/Wienands/Kallakuri

Limited Injection

0200-0500

PC gun study

Dooling

No Injection

0500-0700

Booster chrom and dispersion measurement

Yao

No Injection

0700-0900

PAR training (07-15)

Orne/Bogdan

Limited Injection

0900-1100

Swap out Canted dipole in S16

Jordan

No Beam

0900-1100

L5 noise suppression measurements

T. Smith

Limited injection

0900-1100

Replace filter on P-SR-30 – no flow – SR Dipole, PS in 28-31 off

Swetin

No beam

0900-1300

BTS FS3 adjustments

Wootton

Access Zone F

1300-1500

SR training (07-15)

Davis/LaBuda

Stored Beam & Injection

1500-1700

Linac training (15-23)

Christensen/Berg

Limited Injection

1700-2000

Hybrid setup with P0 (II)

Xiao/Yao/Sajaev

Stored Beam & Injection

2000-2400

Orbit switch

Yipeng Sun

Stored Beam & Injection

 

Wednesday, March 13, 2019

 

 

0000-0630

Open

 

 

0630-0800

Prepare for User beam

OPS

Stored Beam & Injection