Machine Studies

Draft Schedule for Run01-8, 2019

March 18th 0800 – March 19th 0800

 

Time

Descriptions

Studiers

SR Status

 

Monday, March 18, 2019

 

 

0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Hahne

Stored Beam & Injection

0930-1130

RF waveguide switch and RF-5 to Booster

RF Group

No Beam

0930-1130

Replace solenoid coil on S37 hybrid load water circuit

RF Group

No Beam

0930-1130

Investigate P:BM output glitch

Donkers

Limited Injection

0930-1130

Swap out Canted dipole in S16

Jordan

No Beam

0930-1130

Investigate S3B:Q4 magnet temperature

Vargas

No Beam

1000-1130

Replace encoder at Sector 26US

Grimmer

Access Zone D

1130-1200

Recover SR

OPS

Stored Beam & Injection

1200-1400

SR training (07-15)

Davis/LaBuda

Stored Beam & Injection

1400-1600

T-feedback test

Yao/Dimonte

Stored Beam & Injection

1600-2000

Libera Spark, Brilliance+ and zBPM performance study

Sereno/Brill

Stored Beam & Injection

2000-2200

Examination of BCMs for different fills

Emery

Stored Beam & Injection

2200-2400

Open

 

 

 

Tuesday, March 19, 2019

 

 

0000-0500

Commissioning tests

Sajaev

Stored Beam & Injection

0500-0700

Linac training (23-07)

Christensen/Berg

Limited Injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection