Machine Studies
Schedule for Run02-1, 2019 (includes Pre-studies)
May 17th 0800 – May 29th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Fri, May 17, 2019 (Pre-Studies) |
|
|
0800-1000 |
Final checkout & prepare for 324 conditioning with beam |
OPS |
Stored beam & injection |
1000-1600 |
Condition RF cavities with beam to 150mA with 324 singlets at 6 GeV |
OPS |
Stored beam & injection |
1600-2100 |
Lower current scraper studies |
Emery, Yipeng Sun |
Stored beam & injection |
2100-2400 |
Archive scraper motion |
Xiao, Schroeder |
Stored beam & injection |
|
Sat, May 18, 2019 (Pre-studies) |
|
|
0000-0300 |
Archive scraper motion (continued) |
Xiao, Schroeder |
Stored beam & injection |
0300-1100 |
Scraper beam dumps |
Borland Emery, Dooling, Sereno, et al |
Stored beam & injection |
1100-1500 |
Wakefield testing |
Dooling, Xiao, Lindberg |
Stored beam & injection |
|
Additional studies may occur |
|
|
|
Sun, May 19 2019 (Pre-studies) |
|
|
|
Additional studies may occur |
|
|
0630-0700 |
Prepare for Zone F & Zone A access |
OPS |
|
0700-0800 |
FMS rack-out Zone F, Zone A& Dipole switchgear |
FMS |
No beam |
0800-2400 |
Prep to and remove scraper, start bake-out Remove obstruction at 5-ID, start back out |
Multiple groups |
No beam |
|
Mon, May 20, 2019 (Pre-studies) |
|
|
0000-2400 |
Bake-out ongoing |
Vacuum group |
No beam |
0700-1500 |
Condition Linac RF and tune L5 SLED |
Meyer |
No injection |
0700-1500 |
Parasitic PAR RF measurents |
Berenc |
No injection |
|
Tues, May 21, 2019 (Pre-studies) |
|
|
0000-2400 |
Bake-out ongoing/cooldown/prepare for Zone F closure |
Vacuum group |
No beam |
0000-2400 |
Bake-out ongoing/cooldown/prepare for Zone A closure |
|
|
0300-0700 |
Kicker validation |
Fystro |
No injection |
0700-1500 |
Condition Linac RF and tune L5 SLED |
Meyer |
No injection |
|
Wednesday, May 22, 2019 (Pre-studies end at 16:00) |
|
|
0000-1500 |
Position ID and prepare for Zone A closure/close Zone A and prepare for conditioning with beam |
Multiple groups/OPS |
No beam |
1500-2400 |
Conditioning with beam (24 singlets) |
OPS |
Stored beam & injection |
1800-2200 |
BPM checkout (parasitic) |
Sereno |
Stored beam & injection |
1800-2000 |
Initial pinhole camera set-up (parasitic) |
Yang |
Stored beam & injection |
|
Thursday, May 23, 2019 |
|
|
0000-0800 |
Conditioning with beam (24 singlets) (continued) |
OPS |
Stored beam & injection |
0800-1200 |
BPLD validation |
Hahen |
Stored beam &injection |
1200-1600 |
Xbpm check-out |
Hahne |
Stored beam |
1200-1600 |
Booster tune-up (parasitic) |
Calvey |
Occ. inj. possible |
1600-2100 |
Initial lattice setup |
Xiao |
Stored beam & injection |
2100-2400 |
Recover orbit |
Yipeng Sun |
Stored beam & injection |
|
Friday, May 24, 2019 |
|
|
0000-0600 |
OPEN |
|
|
0600-0900 |
Set-up 6GeV, Condition beam up to 150mA with 324 singlets |
OPS |
Stored beam & injection |
0900-1700 |
LFB studies |
Emery Kallakuri |
Stored beam & occ. inj. |
1700-2300 |
CPU checkout |
Xiao |
Stored beam & occ. inj |
2300-0000 |
BPM offset measurements |
OPS |
Stored beam & inj |
|
Saturday, May 25, 2019 |
|
|
0000-0800 |
BPM offset measurements |
OPS |
Stored beam & inj. |
0800-1100 |
ID perturbation measurement (324 singlets) |
Emery |
Stored beam |
1100-1700 |
IEX checkeout |
Xiao |
Stored beam & occ. inj. |
1700-2400 |
OPEN |
|
|
|
Sunday, May 26, 2019 |
|
|
0000-0800 |
OPEN |
|
|
0800-1000 |
test TFB system for different fill patterns |
Yao |
Stored beam & inj. |
1000-1200 |
Investigate 325MeV booster ramp correction problem |
Yao |
Stored beam & inj |
1200-1900 |
OPEN |
|
|
1900-2400 |
Top-up verification |
OPS |
Stored beam & inj. |
|
Monday, May 27, 2019 |
|
|
0000-0900 |
Top-up verification |
OPS |
Stored beam & injection |
0900-2400 |
OPEN |
|
|
|
Tuesday, May 28, 2019 |
|
|
0800-1200 |
ID perturbation measurement |
Xiao, M. Smith |
Stored beam & inj. |
1200-1600 |
Final lattice seteup |
Xiao |
Stored beam & inj. |
1600-1900 |
Final orbit set-up |
Xiao, Yipeng Sun |
Stored beam & inj. |
1900-2100 |
Final pinhole camera set-up & bunch purity set-up |
Yang |
Stored beam & injection |
2100-2200 |
OPEN |
|
|
2200-2300 |
Set-up PAR Bunch Cleaning & check bunch purity |
Harkay |
Stored beam & injection |
2300-2400 |
OPEN |
|
|
|
Wednesday, May 29, 2019 |
|
|
0000-0630 |
OPEN |
|
|
0630-0800 |
Prepare for User beam |
OPS |
Stored beam & injection |