Machine Studies
Draft Schedule for Run02-10, 2019
August 5th 0800 – August 6th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, August 5, 2019 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Sereno |
Stored Beam & Injection |
0930-1000 |
Place power meter in line with Libera processor |
Blake |
No Beam |
0930-1000 |
PSS end to end test 6ID |
McNamara |
No Beam (SR dipole off) |
0930-1130 |
replace water pump for the PC-GUN.30 |
Wright |
No injection |
0930-1100 |
Replace 5V PS in S30:31 interlock rack |
Ackley |
No Beam |
0930-1130 |
Move temperature measurement equipment S14 |
Erwin |
No Beam |
0930-1300 |
Install noise suppression “Pre-amp Phase Shifter” chassis & may install a different 400W amp |
T. Smith |
No injection |
1000-1200 |
SR bucket selection |
Emery, Shoaf, Fors, Lenkzsus |
No beam |
1100-1300 |
Test sr feedback ioc software, may reboot feeback iocs (needs all P.S. on) |
S. Xu |
No beam |
1300-1500 |
SR training (07-15) |
Weyer/Davis |
Stored Beam & Injection |
1500-1800 |
Test TFB. Single bunch or hybrid fill |
Yao |
Stored Beam & injection |
1800-2100 |
IEX beamline emittance measurement (324 singlets) (shutter permit needed) |
Wootton, McChesney (29-ID) |
Stored beam |
1800-2400 |
BTS Measurements |
Xiao |
Occ. injection possible |
2100-2400 |
6 GeV ID feedforward scan. < 100 mA. 324 bunches |
Emery |
Stored beam |
|
Tuesday, August 6, 2019 |
|
|
0000-0530 |
HOM search. < 100 mA 648 bunches. |
Emery Kallakuri |
Stored beam & Injection |
0530-0700 |
Injector training (23-07) |
Grodecki/Berg |
Stored Beam & Injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |