Draft Schedule for Run02-11, 2019

August 12th 0800 – August 13th 0800



Time

Descriptions

Studiers

SR Status


Monday, August 12, 2019



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Sereno

Stored Beam & Injection

0930-1130

Move temperature measurement equipment S16

Diag

No Beam

0930-1300

L5 Pre-amp phase shifter modifications

Smith

Limited Injection

1300-1400

Injector training (07-15)

Weyer/Grodecki/Berg

Stored Beam & Injection

1400-1600

to combine and test switching P0FB and TFB systems. 24 singlet or single bunch.

Yao

Stored beam & injection

1600-1700

observe kicker/septum noise on the LTP and PTB current monitors. Beam through the PAR required.

Keane

Limited injection

1600-1800

test square matrix using sector 18 ID XBPMs (24 singlets)

Sereno

Stored Beam

1800-2200

IEX beamline emittance measurement (shutter permit needed) (324 singlets)

Wootton, McChesney (29-ID)

Stored Beam

1800-2000

PAR dipole conditioning studies and checkout with beam.

Fystro, Harkay

Limited injection

2000-2200

BTS:BB setpoint optimization. Frequent injection needed.

Fystro, Harkay, Emery

Limited injection

2200-2400

Triple RHB for S25. Optics correction

Emery/Yipeng Sun/Sajaev

Stored beam & injection


Tuesday, August 13, 2019



0000-0200

Triple RHB for S25. Optics correction

Emery/Yipeng Sun/Sajaev

Stored beam & injection

0200-0700

HOM Search

Emery

Stored beam & occ. injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection