Machine Studies
Draft Schedule for Run02-5, 2019
June 24th 0800 - June 25th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, June 24, 2019 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Hahne |
Stored Beam & Injection |
0930-1000 |
Switch back to primary pump in PAR. Not bumpless |
Wright |
No injection |
0930-1030 |
Investigate L2:SC2:VL P.S. |
Puttkammer |
No injection |
0930-1130 |
Test the vacuum fast fault chassis in S38 rf cavities |
Bromberek |
No Beam |
0930-1030 |
Replace RF test stand keystroke window air blower |
Wright |
No Beam |
0930-1000 |
Change MPS limit to 115mA |
M. Smith |
No Beam |
0930-1130 |
Replace 5V control power supply in S8 & 11 |
Vargas/Ackley |
No Beam |
0930-1130 |
Move temperature monitoring system equipment |
Erwin |
No Beam |
1000-1130 |
PAR training (07-15) |
LaBuda/Orne |
Stored Beam & Injection |
1000-1030 |
Check cable connection for S38 cold cathode |
Gagliano |
Access Zone F |
1100-1230 |
SR training (07-15) |
LaBuda/Davis |
Stored Beam & Injection |
1230-1630 |
Induce beam dumps in S38 cavities. |
Emery/RF Group |
Stored Beam & injection |
1630-1930 |
PAR loss factor measurement with SR scope |
Yao |
PAR beam only |
1630-1730 |
single bunch beam in SR to check S9 and S17 bpm timing |
Sereno |
Stored beam |
1730-1930 |
orbit correction Start button test -- no beam needed |
Shang |
Stored beam or no beam |
1930-2330 |
Orbit switch |
Yipeng Sun |
Stored Beam & injection |
2330-2400 |
Remeasure response matrix at 6 GeV |
Emery |
Stored Beam & injection |
|
Tuesday, June 25, 2019 |
|
|
0000-0130 |
Remeasure response matrix at 6 GeV |
Emery |
Stored Beam & injection |
0130-0630 |
commissioning tests |
Sajaev |
Stored Beam & injection |
0630-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |