Machine Studies
Draft Schedule for Run02-6, 2019
July 3rd 0800 – July 5th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Wednesday, July 3, 2019 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Hahne/Sereno |
Stored Beam & Injection |
0930-1100 |
Injector training |
LaBuda/Orne |
Limited injection |
0930-1030 |
Replace RF Test Stand keystroke window blower |
Wright |
No Beam |
0930-1030 |
Switch pumps 401,503,513,515,521,and 533 back to lead pump. Bump less switch PS set to zero (S4 through 7, S14 through 19, S22 through 25, S34 through 1) |
Wright |
No Beam |
1000-1100 |
Troubleshoot 20-BM shutter |
Gagliano |
Access Zone C |
1000-1100 |
Troubleshoot S33-34 control valve operation |
Putnam |
No Beam |
1100-1300 |
SR training (07-15) |
LaBuda/Davis |
Stored Beam & Injection |
1300-1500 |
investigate S9B and S17B bpm TBT relative delay at injection. |
Sereno |
Stored beam & inj. |
1500-2100 |
Bunch purity studies |
Harkay, Yang |
Stored beam & Inj. |
2100-2400 |
OPEN |
|
|
|
Thursday, July 4, 2019 |
|
|
0000-0200 |
Injector training (23-07) |
Grodecki/Berg |
Limited injection |
0200-0600 |
OPEN |
|
|
0600-1400 |
HOM search |
Emery, Kallakuri |
Stored beam & Inj. |
1400-1800 |
Testing orbit correction "Start" button with SR beam |
Shang |
Stored beam |
1800-2000 |
Injector training (15-23) |
Bogdan/Orne |
Stored Beam & Injection |
2100-2400 |
PAR High Charge studies |
Harkay |
Limited inj. |
|
Friday, July 5, 2019 |
|
00 |
0000-0200 |
PAR High Charge studies (continued) |
Harkay |
Limited inj. |
0200-0400 |
Injector training (23-07) |
Grodecki/Berg |
Stored Beam & Injection |
0400-0700 |
OPEN |
|
|
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |