Machine Studies
Draft Schedule for Run02-8, 2019
July 22nd 0800 – July 23rd 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, July 22, 2019 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Sereno |
Stored Beam & Injection |
0930-1130 |
BTS/SR PEM testing |
Fystro/Soliday |
No Beam |
1000-1030 |
Measure bellows upstream of L2:AS1 |
RF Group |
Access Linac |
1030-1100 |
Measure removed ID chamber from S7 |
Martens |
Access Zone A |
1100-1200 |
PTB exclusion area rad survey |
HP |
Access Booster |
1200-1400 |
linac beam bunch length measurements |
Yine Sun, Borland |
No injection |
1400-1500 |
Injector training (07-15) |
Ronzhin/Orne |
Stored Beam & Injection |
1500-1700 |
LTP and PTB current monitor kicker/septum noise studies |
Keane |
Limited inj. |
1500-1700 |
Test start button on orbit control with beam |
Emery, Shang |
Stored beam |
1700-2300 |
HOM search 115 mA, 648 bunches |
Emery, et al |
Stored beam & injection |
2300-2400 |
ID gap feedforward with new dispersion orbit compensation. 324 bunches |
Emery |
Stored beam & occ. inj. |
2300-2400 |
BTS measurement |
Xiao |
Occ. inj. possible |
|
Tuesday, July 23, 2019 |
|
|
0000-0200 |
ID gap feedforward with new dispersion orbit compensation. 324 bunches (continued) |
Emery |
Stored beam & occ. inj. |
0000-0500 |
BTS measurement (continued) |
Xiao |
Occ. inj. possible |
0500-0700 |
SR training (23-07) |
LaBuda/Davis |
Stored Beam & Injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |