Machine Studies

Draft Schedule for Run02-8, 2019

July 22nd 0800 – July 23rd 0800



Time

Descriptions

Studiers

SR Status


Monday, July 22, 2019



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Sereno

Stored Beam & Injection

0930-1130

BTS/SR PEM testing

Fystro/Soliday

No Beam

1000-1030

Measure bellows upstream of L2:AS1

RF Group

Access Linac

1030-1100

Measure removed ID chamber from S7

Martens

Access Zone A

1100-1200

PTB exclusion area rad survey

HP

Access Booster

1200-1400

linac beam bunch length measurements

Yine Sun, Borland

No injection

1400-1500

Injector training (07-15)

Ronzhin/Orne

Stored Beam & Injection

1500-1700

LTP and PTB current monitor kicker/septum noise studies

Keane

Limited inj.

1500-1700

Test start button on orbit control with beam

Emery, Shang

Stored beam

1700-2300

HOM search 115 mA, 648 bunches

Emery, et al

Stored beam & injection

2300-2400

ID gap feedforward with new dispersion orbit compensation. 324 bunches

Emery

Stored beam & occ. inj.

2300-2400

BTS measurement

Xiao

Occ. inj. possible


Tuesday, July 23, 2019



0000-0200

ID gap feedforward with new dispersion orbit compensation. 324 bunches (continued)

Emery

Stored beam & occ. inj.

0000-0500

BTS measurement (continued)

Xiao

Occ. inj. possible

0500-0700

SR training (23-07)

LaBuda/Davis

Stored Beam & Injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection