Machine Studies

Draft Schedule for Run03-2, 2019

October 7th 0800 – October 8th 0800



Time

Descriptions

Studiers

SR Status


Monday, October 7, 2019



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Hahne

Stored Beam & Injection

0930-1030

Reboot front end IOCs

Smith

No beam

0930-1030

Update script for Booster detuned RF frequency

No SR Injection

Harkay

0930-1130

Investigate SR converter S13A:V3

Puttkammer

No Beam

0930-1130

Investigate temperature readback on S:IS1

Vargas

No Beam

0930-1130

Troubleshoot Firing Generator board S:BM

Puttkammer

No Beam

0930-1130

Move temperature measurement system S18

Erwin

No Beam

0930-1130

Injector training (07-15)

Bogdan/Orne

Limited Injection

0930-1130

Linac traning (07-15)

Bogdan/ Berkland

Limited Injection

1130-1200

SR recovery

OPS

Stored Beam & Injection

1200-1400

BPLD validation script testing

Sereno/Shang /Hahne

Stored Beam & Injection

1400-1800

APS-U BPM studies

Sereno/Cheng/Brill

Stored Beam & Injection

1800-2200

5x5 sigma matrix measurements in BTS

Borland/ Wootton

Limited Injection

1800-2100

28-ID XBPM study

Yang

Limited Injection

2100-2400

Investigate excessive beam motion during steering

Emery

Stored beam

2200-2400

425 Mev Linac setup and Optimizer test

Yine Sun/ Shang

No Injection


Tuesday, October 8, 2019



0000-0200

425 MeV booster setup (continued)

Harkay/ Calvey

No Injection

0000-0200

Investigate excessive beam motion during steering (continued)

Emery

Stored beam

0200-0700

6 GeV lattice setup

Emery

Stored Beam & Injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection