Machine Studies

Draft Schedule for Run03-4, 2019

October 21st 0800 – October 22nd 0800

 

Time

Descriptions

Studiers

SR Status

 

Monday, October 21, 2019

 

 

0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Hahne

Stored Beam & Injection

0930-1130

Troubleshoot Firing Generator board S:BM

Puttkammer

No Beam

0930-1130

Investigate/replace Gespac crate in SR S39 cabinet 1

Jordan

No Beam

0930-1130

Move temperature measurement system S26

Erwin

No Beam

0930-1130

Injector training (07-15)

Weyer/Berg

Limited Injection

1000-1100

Check 14ID DS encoders

Grimmer/ Gagliano

Access Zone B

1130-1200

SR recovery

OPS

Stored Beam & Injection

1200-1600

APS-U BPM studies

Sereno/ Cheng/ Steinmann

Stored Beam & Injection

1600-1900

S25 BPM calibration and Sextupole-based BPM offset measurement

Sajaev

Stored Beam & Injection

1900-2100

Investigate orbit disturbances during operations steering

Emery

Limited Injection

1900-2100

Linac training (15-23)

Bogdan/ Berkland

Limited Injection

2100-2400

Orbit switch

Xiao

Stored Beam & Injection

 

Tuesday, October 22, 2019

 

 

0000-0100

Orbit switch

Xiao

Stored Beam & Injection

0100-0630

Various studies at 6 GeV

Emery

Stored Beam & Injection

0630-0800

Prepare for User beam

OPS

Stored Beam & Injection