Machine Studies
Draft Schedule for Run03-5, 2019
October 28th 0800 – October 29th 0800
Time | Descriptions | Studiers | SR Status |
| Monday, October 28, 2019 |
|
|
0800-0810 | Collect XBPM orbit data | OPS | Stored Beam & Injection |
0810-0930 | Gap Scans and update IDGapFF look-up tables | Sereno | Stored Beam & Injection |
0930-1130 | Move temperature measurement system S30 | Erwin | No beam |
1000-1100 | check of the Waveguide Air PSS at the 420 Test stand -- all 420 RF systems off | Bromberek | No beam |
1015-1300 | Replace 14-ID downstream undulator | Grimmer | Access Zone B |
1100-1300 | Injector training (07-15) | Weyer/Berg | Limited Injection |
1300-1430 | Shielding validation, if needed, search and recover the SR | OPS | No beam |
1400-1430 | BPLD Validation for RF | Sereno | Stored beam & injection |
1430-1700 | Troubleshoot Firing Generator board S:BM | Puttkammer | No Beam |
1500-1700 | Injector training (15-23) | LaBuda/Orne | Limited Injection |
1700-1800 | GRID XBPM study | Paskvan/ Sereno | Stored beam & injection |
1800-2200 | Measure/Adjust Booster chromaticity then take the SR bunch purity data | Yao/Yang | No Beam |
2200-2300 | Test Quick Start on Orbit Controllaw | Shang | Stored beam & injection |
2300-2400 | Use V1/V2 pairs for vertical steering | Emery/ Shang | Stored beam & injection |
| Tuesday, October 29, 2019 |
|
|
0000-0100 | Use V1/V2 pairs for vertical steering | Emery/ Shang | Stored beam & injection |
0100-0630 | Setup 6GeV lattice | Emery | Stored beam & injection |
0630-0800 | Prepare for User beam | OPS | Stored Beam & Injection |