Machine Studies

Draft Schedule for Run03-5, 2019

October 28th 0800 – October 29th 0800

 

Time

Descriptions

Studiers

SR Status

 

Monday, October 28, 2019

 

 

0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Sereno

Stored Beam & Injection

0930-1130

Move temperature measurement system S30

Erwin

No beam

1000-1100

check of the Waveguide Air PSS at the 420 Test stand -- all 420 RF systems off

Bromberek

No beam

1015-1300

Replace 14-ID downstream undulator

Grimmer

Access Zone B

1100-1300

Injector training (07-15)

Weyer/Berg

Limited Injection

1300-1430

Shielding validation, if needed, search and recover the SR

OPS

No beam

1400-1430

BPLD Validation for RF

Sereno

Stored beam & injection

1430-1700

Troubleshoot Firing Generator board S:BM

Puttkammer

No Beam

1500-1700

Injector training (15-23)

LaBuda/Orne

Limited Injection

1700-1800

GRID XBPM study

Paskvan/ Sereno

Stored beam & injection

1800-2200

Measure/Adjust Booster chromaticity then take the SR bunch purity data

Yao/Yang

No Beam

2200-2300

Test Quick Start on Orbit Controllaw

Shang

Stored beam & injection

2300-2400

Use V1/V2 pairs for vertical steering

Emery/ Shang

Stored beam & injection

 

Tuesday, October 29, 2019

 

 

0000-0100

Use V1/V2 pairs for vertical steering

Emery/ Shang

Stored beam & injection

0100-0630

Setup 6GeV lattice

Emery

Stored beam & injection

0630-0800

Prepare for User beam

OPS