Draft Schedule for Run03-6, 2019
November 4th 0800 – November 6th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, November 4, 2019 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Hahne |
Stored Beam & Injection |
0930-1130 |
Run cables from the MCR relay racks to the computer room |
Pietryla |
No Beam |
0930-1130 |
Switch the 420 rf systems from RF2/RF4 to RF3/RF4 |
RF Group |
No Beam |
0930-1130 |
Inspect/trace SR Interlock cables in Zone A |
Ruan |
No Beam |
0930-1130 |
Troubleshoot the faulty spare Firing Generator Board for the SR Dipole |
Abid |
No Beam Dipole on |
0930-1130 |
Troubleshoot 25ID IR camera |
Erwin |
No Beam |
0930-1130 |
Linac training (07-15) |
Ronzhin/ Berkland |
Limited Injection |
1130-1330 |
Run a cable from the timeserver to the timing rack and patch it to the MCR |
Pietryla |
No Beam |
1130-1430 |
Rf water temperature response to set point |
Emery |
No Beam |
1130-1430 |
L3 charge optimization |
Shang/ YineSun |
No Beam |
1430-1500 |
SR recovery |
OPS |
Stored Beam & Injection |
1500-1900 |
Hybrid Lattice Setup |
Xiao/Yao |
Stored Beam & Injection |
1900-2400 |
6 GeV setup |
Emery |
Stored Beam & Injection |
|
Tuesday, November 5, 2019 |
|
|
0000-0800 |
APS-U BPM studies |
Sereno et al. |
Stored Beam & Injection |
0800-1200 |
Booster chrom bunch purity study |
Yao/Harkay |
Stored Beam & Injection |
1200-1400 |
Test TFB with 324 fill patterns |
Yao/Shang |
Stored Beam & Injection |
1400-1800 |
Orbit Switch |
YipengSun |
Stored Beam & Injection |
1800-1900 |
Adjust P0 feedback parameters for hybrid |
Emery |
Stored Beam & Injection |
1900-2100 |
6GeV set up |
Emery |
Stored Beam & Injection |
2100-2400 |
HOM search (102 mA, High rf water temperature) |
Emery/ Kallakuri |
Stored Beam & Injection |
|
Wednesday, November 6, 2019 |
|
|
0000-0430 |
HOM search (102 mA, High rf water temperature) |
Emery/ Kallakuri |
Stored Beam & Injection |
0430-0630 |
Injector training (23-07) |
LaBuda/Orne |
Limited Injection |
0630-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |