Machine Studies

Draft Schedule for Run03-9, 2019

November 27th 0800 – November 29th 0800

 

Time

Descriptions

Studiers

SR Status

 

Wednesday, November 27, 2019

 

 

0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Hahne

Stored Beam & Injection

0930-1030

Pull XBPM test cable

Yang

Stored Beam & Injection

0930-1130

Investigate remote reset for PTB:B1

Donkers

Limited Injection

1100-1230

Replace S36 RF Cavity blower

MOM Group

Zone F Access

1230-1400

Injector training (07-15)

Weyer/Orne

Limited Injection

1400-2000

6 GeV Study

Emery/Sajaev

Stored Beam & Injection

2000-2300

Troubleshoot Booster B2C8 BPMs

Yao/Pietryla

Stored Beam & Injection

2000-2300

S25 BPM study

Sereno et al.

Stored Beam & Injection

2300-2400

BPM offset measurement

OPS

Stored Beam & Injection

 

Thursday, November 28, 2019

 

 

0000-0700

BPM offset measurement

OPS

Stored Beam & Injection

0700-0900

Injector training (07-15)

Smith/Berg

Limited Injection

0900-1600

Linac L3 charge optimization

Shang

Limited Injection

0900-1500

CPU measurement

Xiao

Limited Injection

1600-2100

BPM offset measurement

OPS

Stored Beam & Injection

2100-2300

Injector training (15-23)

LaBuda/Orne

Limited Injection

2300-2400

6 GeV Study

Emery

Stored Beam & Injection

 

Friday, November 29, 2019

 

 

0000-0700

6 GeV Study

Emery

Stored Beam & Injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection