Machine Studies
Schedule for Run01-1, 2020 (includes Pre-studies)
Jan. 24th 0700 – Jan 31st 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Fri, Jan. 24, 2020 (Pre-Studies) |
|
|
0700-0830 |
MPS Validations |
Marty Smith/OPS/RF Group |
Stored beam & injection |
0830-1500 |
Set up injection at 7 GeV. Set up injection/orbit for 6GeV 324 singlets |
Sajaev |
Stored beam & injection |
1500-2100 |
Condition RF cavities with beam to 150mA with 324 singlets at 6 GeV |
OPS |
Stored beam & injection |
2100-2400 |
Lower current scraper studies -- Measure offsets - do LOCO |
Emery, Dooling |
Stored beam & injection |
|
Sat, Jan. 25, 2020 (Pre-studies) |
|
|
0000-0800 |
Find scraper position |
Emery, Dooling |
Stored beam & injection |
0800-2400 |
Condition scraper with beam |
Sajaev, Calvey, Harkay, Dooling |
Stored beam & injection |
|
Sun, Jan. 26, 2020 (Pre-studies) |
|
|
0000-1000 |
Condition scraper with beam (if needed) |
|
Stored beam & injection |
1000-1800 |
Scraper beam dumps |
Borland, Harkay, Lumpkin |
Stored beam & injection |
1800-2400 |
Wakefield testing (low current) |
Borland, Lindberg, Dooling |
Stored beam & injection |
|
Mon, Jan. 27 2020 (Pre-studies) |
|
|
0000-0200 |
Wakefield testing (low current) |
Borland, Lindberg, Dooling |
Stored beam & injection |
0200-0630 |
Additional studies that have been approved by HP if time allows |
?? |
Stored beam & inj. |
0630-0700 |
Prepare for Zone F |
OPS |
No beam |
0700-0800 |
FMS rack-out Zone F, Zone A& Dipole switchgear |
FMS |
No beam |
0800-2400 |
Prep to remove scraper, start bake-out |
Multiple groups |
No beam |
1400-1500 |
PAR Qualification |
Berkand, Fystro |
No injection |
|
Tues, Jan 28, 2020 (Pre-studies) |
|
|
0000-1100 |
Bake-out ongoing/cooldown/prepare for Zone F closure |
Vacuum group |
No beam |
1100-1400 |
Complete installation of spool piece |
Multiple groups |
No beam |
1400-1600 |
HP shielding survey/tunnel search/ rack in switchgear |
HP/OPS/FAC |
No beam |
1600-1800 |
Set-up 324 singlets, 7 GeV, 100mA and recover orbit at 19-BM |
Emery/Sajaev |
Stored beam & injection |
1800-2200 |
Study at 19-BM (shutter permit needed) |
19-BM |
Stored beam |
2200-2400 |
Condition with beam (24 singlets) |
OPS |
Stored beam & injection |
|
Wed, Jan. 28, 2020 (Pre-studies end at 08:00) |
|
|
0000-1400 |
Condition with beam (24 singlets) |
OPS |
Stored beam & inj. |
1400-1700 |
BPLD validations |
Hahne |
Stored beam & inj. |
1700-1800 |
X-ray BPM check-out |
Hahne |
Stored beam & occ. inj. |
1800-2400 |
S25 Gas injection experiment |
Calvey, et all |
Stored beam & inj. |
|
Thursday, Jan 30, 2020 |
|
|
0000-0300 |
S25 Gas injection experiment |
Calvey, et all |
Stored beam & inj. |
0300-0400 |
Operator training (2300-0700) |
Weyer/Orne |
Stored beam & injection |
0400-0900 |
Orbit recovery |
Xiao |
Stored beam & inj. |
0900-0930 |
Prepare for Zone F access and FAC rack out switchgear |
OPS/FAC |
No beam |
0930-1100 |
Replace bad thermocouple and S37 Cav. 2 blower |
Pace/McKenzie |
Zone F access |
1000-1100 |
Operator training (0700-1500) |
LaBuda, Kimbro |
Limited inj. |
1100-1200 |
Recover from access |
|
|
1200-1800 |
Final orbit/lattice setup |
Emery Sajaev |
Stored beam & inj. |
1800-2200 |
Set-up bunch purity monitor/final pinhole camera setup |
Calvey, Yang |
Stored beam & inj. |
2200-2400 |
Combined CPU/IEX checkout |
Xiao |
Stored beam & Occ. Inj. |
|
Friday, Jan 31, 2020 |
|
|
0000-0630 |
Combined CPU/IEX checkout (continued) |
Xiao |
Stored beam &Occ. inj. |
0630-0800 |
Prepare for User Operations (24 singlets) |
OPS |
Stored beam & inj. |