Machine Studies

Schedule for Run01-1, 2020 (includes Pre-studies)

Jan. 24th 0700 – Jan 31st 0800

Time

Descriptions

Studiers

SR Status


Fri, Jan. 24, 2020 (Pre-Studies)



0700-0830

MPS Validations

Marty Smith/OPS/RF Group

Stored beam & injection

0830-1500

Set up injection at 7 GeV. Set up injection/orbit for 6GeV 324 singlets

Sajaev

Stored beam & injection

1500-2100

Condition RF cavities with beam to 150mA with 324 singlets at 6 GeV

OPS

Stored beam & injection

2100-2400

Lower current scraper studies -- Measure offsets - do LOCO

Emery, Dooling

Stored beam & injection


Sat, Jan. 25, 2020 (Pre-studies)



0000-0800

Find scraper position

Emery, Dooling

Stored beam & injection

0800-2400

Condition scraper with beam

Sajaev, Calvey, Harkay, Dooling

Stored beam & injection


Sun, Jan. 26, 2020 (Pre-studies)



0000-1000

Condition scraper with beam (if needed)


Stored beam & injection

1000-1800

Scraper beam dumps

Borland, Harkay, Lumpkin

Stored beam & injection

1800-2400

Wakefield testing (low current)

Borland, Lindberg, Dooling

Stored beam & injection


Mon, Jan. 27 2020 (Pre-studies)



0000-0200

Wakefield testing (low current)

Borland, Lindberg, Dooling

Stored beam & injection

0200-0630

Additional studies that have been approved by HP if time allows

??

Stored beam & inj.

0630-0700

Prepare for Zone F

OPS

No beam

0700-0800

FMS rack-out Zone F, Zone A& Dipole switchgear

FMS

No beam

0800-2400

Prep to remove scraper, start bake-out

Multiple groups

No beam

1400-1500

PAR Qualification

Berkand, Fystro

No injection


Tues, Jan 28, 2020 (Pre-studies)



0000-1100

Bake-out ongoing/cooldown/prepare for Zone F closure

Vacuum group

No beam

1100-1400

Complete installation of spool piece

Multiple groups

No beam

1400-1600

HP shielding survey/tunnel search/ rack in switchgear

HP/OPS/FAC

No beam

1600-1800

Set-up 324 singlets, 7 GeV, 100mA and recover orbit at 19-BM

Emery/Sajaev

Stored beam & injection

1800-2200

Study at 19-BM (shutter permit needed)

19-BM

Stored beam

2200-2400

Condition with beam (24 singlets)

OPS

Stored beam & injection


Wed, Jan. 28, 2020 (Pre-studies end at 08:00)



0000-1400

Condition with beam (24 singlets)

OPS

Stored beam & inj.

1400-1700

BPLD validations

Hahne

Stored beam & inj.

1700-1800

X-ray BPM check-out

Hahne

Stored beam & occ. inj.

1800-2400

S25 Gas injection experiment

Calvey, et all

Stored beam & inj.


Thursday, Jan 30, 2020



0000-0300

S25 Gas injection experiment

Calvey, et all

Stored beam & inj.

0300-0400

Operator training (2300-0700)

Weyer/Orne

Stored beam & injection

0400-0900

Orbit recovery

Xiao

Stored beam & inj.

0900-0930

Prepare for Zone F access and FAC rack out switchgear

OPS/FAC

No beam

0930-1100

Replace bad thermocouple and S37 Cav. 2 blower

Pace/McKenzie

Zone F access

1000-1100

Operator training (0700-1500)

LaBuda, Kimbro

Limited inj.

1100-1200

Recover from access



1200-1800

Final orbit/lattice setup

Emery Sajaev

Stored beam & inj.

1800-2200

Set-up bunch purity monitor/final pinhole camera setup

Calvey, Yang

Stored beam & inj.

2200-2400

Combined CPU/IEX checkout

Xiao

Stored beam & Occ. Inj.


Friday, Jan 31, 2020



0000-0630

Combined CPU/IEX checkout (continued)

Xiao

Stored beam &Occ. inj.

0630-0800

Prepare for User Operations (24 singlets)

OPS

Stored beam & inj.