Machine Studies

Draft Schedule for Run01-12, 2020

April 13h 0800 – April 14th 0800



Time

Descriptions

Studiers

SR Status


Monday, April 13, 2020



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-1000

Gap Scans and update IDGapFF look-up tables

Sereno

Stored Beam & Injection

0810-1000

Testing Linac LLRF power supply alarms with L3RF

Fystro, Pietryla

No impact

1000-1300

Swap out leaking S23B:S3 P.S.

Puttkammer

No Beam

1000-1100

PEM testing in the PAR

Fystro, Soliday

No injection

1100-1300

Booster training (07-15)

Grodecki/Berg

Limited Injection

1300-1400

Test the transfer corrector reference in SROrbitControllaw

Shang

Stored Beam

1300-1400

Refresh Linac Zone B SF6

Michalek

No injection

1400-1700

test SFSD ramp optimizer with 5 nC beam and no booster extraction

Yao, Shang

No injection

1700-1800

Check TFB noise of 324 bunch fill pattern. Need to change rf frequency.

Yao

Stored beam & inj.

1800-2200

PAR tune measurements vs dipole setpt

Harkay

No injection

2200-2400

6 GeV dynamic aperture measurement

Emery

Stored beam & injection


Tuesday, April 14, 2020



0000-0200

6 GeV dynamic aperture measurement

Emery

Stored beam & injection

0200-0500

OPEN



0500-0700

SR training (23-07)

Ronzhin/Berkland

Stored Beam & Injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection