Machine Studies

Draft Schedule for Run01-16, 2020

May 11th 0800 – May 12th 0800



Time

Descriptions

Studiers

SR Status


Monday, May 11, 2020



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-1000

Gap Scans and update IDGapFF look-up tables

Sereno

Stored Beam & Injection

1000-1200

Inspect L5 PFN capacitors

RF Group

No Injection

1000-1200

Test Linac LLRF power supply alarms with L2RF and L5RF

Pietryla/Fystro

No Injection

1200-1400

Linac training (07-15)

LaBuda/Kimbro

Limited Injection

1400-1500

Measure slew rate of correctors. Need injection & at least 2 mA stored beam.

Emery

Stored beam & inj.

1500-1800

study taking out 4 bpms from XRDP and DP in sector 27

Sereno

Stored beam & inj.

1800-2000

SR training (15-23)

Ronzhin/Berkland

Stored beam & injection

2000-2100

PAR ICT FPGA scope waveform test. PAR injection in 1Hz mode

Yao/DiMonte

Stored beam

2100-2400

Test BTS2S2 single-turn BPM and response measurement app

Yao/Shang/Pietryla

No injection, no SR beam


Tuesday, May 12, 2020



0000-0100

Test BTS2S2 single-turn BPM and response measurement app (cont)

Yao/Shang/Pietryla

No injection, no SR beam

0100-0400

bunch purity measurements, part 2. 100 mA, 24 bunches, topup

Harkay (+Yao or Emery if needed)

Store beam & inj.

0400-0600

SR training (23-07)

Weyer/Orne

Limited Injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection