Machine Studies
Draft Schedule for Run01-17, 2020
May 18th 0800 – May 20th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, May 18, 2020 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-1000 |
Gap Scans and update IDGapFF look-up tables |
Sereno |
Stored Beam & Injection |
1000-1030 |
Switch pump 524 over |
Wright |
No Beam |
1030-1230 |
Inspect/repair water leaks S13 & 22 |
Bechtold |
Access Zones B & C |
1230-1300 |
Recover SR |
OPS |
|
1300-1500 |
SR training (07-15) |
Grodecki/Berg |
Limited Injection |
1500-1700 |
Linac requalification |
Smith/Fystro |
Limited Injection |
1700-2100 |
Booster orbit correction |
Calvey, Yao |
Limited injection |
2100-2300 |
OPEN |
|
|
2300-2400 |
Measurement to compare perturbation results from old and new CPU correction tables (Xiao will provide instructions and be available for support) |
OPS |
Stored beam |
|
Tuesday, May 12, 2020 |
|
|
0000-0500 |
Measurement to compare perturbation results from old and new CPU correction tables (Xiao will provide instructions and be available for support) |
OPS |
Stored beam |
0500-0700 |
SR training (23-07) |
Ronzhin/Berkland |
Limited Injection |
0700-0900 |
SR training (07-15) |
Grodecki/Berg |
Limited Injection |
0900-1000 |
Fix triggering for MPS dump |
Emery, Shang |
Stored beam & inj. |
1000-1100 |
Measure corrector slew rate |
Emery |
Stored beam & inj. |
1100-1500 |
single-turn SR BPM test and BTS response measurement |
Yao, Shang, Pietryla |
Stored beam & inj. |
1500-1700 |
Linac requalification |
Davis/Fystro |
Limited Injection |
1700-1900 |
Sector 27 bpm studies |
Sereno |
Stored beam & inj. |
1900-2300 |
Booster orbit correction |
Calvey, Yao |
Limited injection |
2300-2400 |
OPEN |
|
|
|
Wednesday, May 20, 2020 |
|
|
0000-0500 |
OPEN |
|
|
0500-0700 |
SR training (23-07) |
Ronzhin/Berkland |
Limited Injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |