Machine Studies
Draft Schedule for Run01-4, 2020
February 17th 0800 – February 18th 0800
|
Time |
Descriptions |
Studiers |
SR Status |
|
|
Monday, February 17, 2020 |
|
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
|
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Hahne |
Stored Beam & Injection |
|
0900-0930 |
Test the Booster energy save program (parasitic) |
Fystro/Shank |
No impact |
|
0930-1000 |
Swap Bergoz cards |
Erwin |
No Beam |
|
0930-1200 |
Characterize Linac RF synthesizers |
Smith |
Limited Injection |
|
0930-1030 |
BTS power supply PEM testing |
Fystro/Soliday |
No injection |
|
1000-1100 |
Remove matching networks at S27A:P3 |
Brill |
Access Zone D |
|
1000-10:30 |
Reseat dsp cards for iocs9fb |
Shifu Xu |
No beam |
|
1000-1030 |
Adjust manual leak rate for S25 gas study |
Calvey/Vac Group |
Access Zone D |
|
1000-1200 |
TFB system loading of 324 control |
Yao |
Parasitic |
|
1200-1400 |
Libera Digit 500 demonstration for PAR ICT |
Wootton, Keane, Brill |
Limited injection |
|
1200-1300 |
Reboot fb ioc and check ID28 bpms |
Emery, Shifu Xu |
Stored beam |
|
1300-1600 |
continue setup 324 bunch pattern of TFB system |
Yao , DiMonte, Shang |
Stored beam |
|
1300-1700 |
6 GeV lattice development |
Emery, Sajaev, Borland |
Stored beam & injection |
|
1700-1900 |
Adjust manual leak rate for S25 gas study |
Calvey/Vac Group |
Access Zone D |
|
1900-2400 |
Gas injection study |
Calvey, Clute, Emery + others |
Stored beam & injection |
|
|
Tuesday, February 18, 2020 |
|
|
|
0000-0100 |
Gas injection study (continued) |
Calvey, Clute, Emery + others |
Stored beam & injection |
|
0100-0300 |
Linac training (23-07) |
LaBuda/Kimbro |
Stored Beam & Injection |
|
0300-0700 |
TBD |
Sajaev |
Stored beam & inj. |
|
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |