Machine Studies

Draft Schedule for Run01-7, 2020

March 9th 0800 – March 10th 0800



Time

Descriptions

Studiers

SR Status


03/09/20



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Hahne

Stored Beam & Injection

0930-1000

Reboot iocs27fb

Xu

No Beam

0930-1200

test y-front-end box of TFB

Yao

No impact





1000-1030

Repair S29XBPM ADC

Xu/Yang

No Beam

1000-1100

Unlock 2ID shutters

MOM

Access Zone A

1000-1100

Troubleshoot problem with IR detector in S40C2

Wright

Access Zone F

1100-1200

Measure booster chromaticity -- need Booster beam, changes rf frequency

Shang

No Beam

1100-1200

Recover from accesses

OPS

No Beam

1200-1400

investigate y-channel noise of TFB (324 singlets)

Yao

Stored Beam

1200-1300

Booster training (07-15)

Weyer/Berg

Limited inj.

1300-1400

Booster training (07-15)

Weyer/Orne

Limited inj.

1400-1800

6 GeV beam lifetime measurements

Borland, Emery

Stored Beam

1800-1900

ID-2 canting set up

Emery, Shang

Stored Beam

1900-2300

Continue testing Libera BPM electronics in S27

Brill, Sereno

Stored beam & inj.

2300-2400

HSCU heatload study.

Sajaev

Stored Beam & Inj.


03/10/20



0000-0300

HSCU heatload study (continued)

Sajaev

Stored Beam & Inj.

0300-0700

On axis injection measurement

Xiao

Stored Beam & Inj.

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection