March 9th 0800 – March 10th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
03/09/20 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Hahne |
Stored Beam & Injection |
0930-1000 |
Reboot iocs27fb |
Xu |
No Beam |
0930-1200 |
test y-front-end box of TFB |
Yao |
No impact |
|
|
|
|
1000-1030 |
Repair S29XBPM ADC |
Xu/Yang |
No Beam |
1000-1100 |
Unlock 2ID shutters |
MOM |
Access Zone A |
1000-1100 |
Troubleshoot problem with IR detector in S40C2 |
Wright |
Access Zone F |
1100-1200 |
Measure booster chromaticity -- need Booster beam, changes rf frequency |
Shang |
No Beam |
1100-1200 |
Recover from accesses |
OPS |
No Beam |
1200-1400 |
investigate y-channel noise of TFB (324 singlets) |
Yao |
Stored Beam |
1200-1300 |
Booster training (07-15) |
Weyer/Berg |
Limited inj. |
1300-1400 |
Booster training (07-15) |
Weyer/Orne |
Limited inj. |
1400-1800 |
6 GeV beam lifetime measurements |
Borland, Emery |
Stored Beam |
1800-1900 |
ID-2 canting set up |
Emery, Shang |
Stored Beam |
1900-2300 |
Continue testing Libera BPM electronics in S27 |
Brill, Sereno |
Stored beam & inj. |
2300-2400 |
HSCU heatload study. |
Sajaev |
Stored Beam & Inj. |
|
03/10/20 |
|
|
0000-0300 |
HSCU heatload study (continued) |
Sajaev |
Stored Beam & Inj. |
0300-0700 |
On axis injection measurement |
Xiao |
Stored Beam & Inj. |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |