Machine Studies
Draft Schedule for Run01-9, 2020
March 23rd 0800 – March 24th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, March 23, 2020 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Sereno (home) |
Stored Beam & Injection |
0930-1030 |
Pump 521 & 533 switch (S22-25, S34-S37 P.S. at 0A) |
Wright |
No Beam |
0930-1030 |
Troubleshoot RF4 cold cathode trip |
RF Group |
No Beam |
1030-1100 |
Recover SR |
OPS |
Stored Beam & inj. |
1100-1500 |
6GeV instability and lifetime studies |
Borland, Emery |
Stored Beam & occ. inj. |
1500-1700 |
Test TFB for single bunch or hybrid mode |
Yao, Emery |
Stored Beam & inj. |
1700-2100 |
Investigate injection efficiency for low charge and single bunch limit for hybrid |
Emery, Sajaev |
Stored Beam & Inj. |
2100-2400 |
PAR Scrubbing at 7nC @ 2 Hz-- other studies may preempt this study Follow High-charge MCR procedure |
OPS |
No injection |
|
Tuesday, March 24, 2020 |
|
|
0000-0300 |
PAR Scrubbing at 7nC (continued) |
OPS |
No injection |
0000-0700 |
OPEN (Continue PAR scrubbing if not used) |
|
|
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |