Schedule for Run02-10, 2020

September 9th 0800 – September 14th 0800

Time

Descriptions

Studiers

SR Status


Wednesday, September 9, 2020



0800-1400

BPLD validations and BPM checkout

Sereno

Stored Beam & Injection

1400-1800

X-ray BPM sanity check

Sereno

Stored Beam & Injection

1800-2200

Set up ID25 canted orbit and Injection improvement

Emery

Stored Beam & Injection

2200-2400

Lattice setup

Xiao

Stored Beam & Injection


Thursday, September 10, 2020



0000-0200

Lattice setup

Xiao

Stored Beam & Injection

0200-0600

Orbit recovery

Y.P. Sun

Stored Beam & Injection

0600-1130

S25 GRID xBPM studies

Sereno et. al.

Stored Beam & Injection

1100-1200

Prepare for Tunnel Accesses

OPS

No Beam

1100-1400

Troubleshoot S25C:H1 and C:V1

Wang

No Beam

1130-1330

Switch pump 517 for motor repairs (P.S. S17 through 20 set to 0)

Wright

No Beam

1200-1430

Replace thermocouple on S36 Cav3 upstream cavity cover thermocouple

RF Group

Controlled Access Zone F

1200-1430

Troubleshoot/replace IK3 blower

Wright

Controlled Access Zone F

1300-1400

Switch back to the primary Klystron pump

Dench

No injection

1300-1400

Guided APS tunnel tour

S. Streiffer

Authorized Access Zone A

1430-1530

Prepare for SR Injection

OPS

Stored Beam & Injection

1530-1700

SR Operator training (15-23)

Grodecki/ Berkland

Stored Beam & Injection

1700-2100

ID4 aperture measurement

Emery

Stored Beam & Injection

2100-2400

Vertical scraper for lifetime reference

Emery

Stored Beam & Injection


Friday, September 11, 2020



0000-0100

Vertical scraper for lifetime reference

Emery

Stored Beam & Injection

0100-0700

CPU/IEX checkout

Xiao

Limited Injection

0100-0700

RG1 commissioning

Y.E. Sun

Limited Injection

0700-1100

Beam arrival time detector calibration in BTS

Sereno et. al.

Limited Injection

1100-1700

6 GeV measurement of instabilities

Emery/ Lindberg

Stored Beam & Injection

1700-2100

6 GeV ID corrector feed-forward re-measurement

Emery

Stored Beam & Injection

2100-2300

SR Operator training (15-23)

Grodecki/ Berkland

Stored Beam & Injection

2300-2400

Booster momentum offset variation setup and emittance measurement in BTS

Harkay

Booster Beam


Saturday, September 12, 2020



0000-0500

Booster momentum offset variation setup and emittance measurement in BTS

Harkay

Booster Beam

0500-0700

Booster chrom correction test

Yao/Shang

Booster Beam

0700-1100

Beam feedback setup

Yao

Stored Beam & Injection

1100-1500

Sextupole offset measurement

Sajaev

Stored Beam & Injection

1500-1600

Turn-by-turn BPM data with low chromaticity

Huang/Sajaev/ Y.P. Sun

Stored Beam & Injection

1600-2000

Response matrix measurement

Y.P. Sun

Stored Beam & Injection

2000-2200

SR Operator training (11-23)

Grodecki/ Berkland

Stored Beam & Injection

2200-2400

Topup validation

OPS

Stored Beam & Injection


Sunday, September 13, 2020



0000-0800

Topup validation

OPS

Stored Beam & Injection

0800-1200

Pinhole camera and bunch purity setup

Yang/Harkay

Stored Beam & Injection

1200-1600

Final lattice setup

Xiao

Stored Beam & Injection

1600-2000

Final orbit setup

Y.P. Sun

Stored Beam & Injection

2000-2200

SR Operator training (11-23)

Grodecki/ Berkland

Stored Beam & Injection

2200-2400

Abort kicker checkout

Harkay

Stored Beam & Injection


Monday, September 14, 2020



0000-0600

HOM search, Try H-plane feedback

Emery/ Kallakuri

Stored Beam & Injection

0600-0800

Prepare for user Operations (24 singlets – Top-Up)

Ops