Machine Studies
Schedule for Run02-10, 2020
September 9th 0800 – September 14th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Wednesday, September 9, 2020 |
|
|
0800-1400 |
BPLD validations and BPM checkout |
Sereno |
Stored Beam & Injection |
1400-1800 |
X-ray BPM sanity check |
Sereno |
Stored Beam & Injection |
1800-2200 |
Set up ID25 canted orbit and Injection improvement |
Emery |
Stored Beam & Injection |
2200-2400 |
Lattice setup |
Xiao |
Stored Beam & Injection |
|
Thursday, September 10, 2020 |
|
|
0000-0200 |
Lattice setup |
Xiao |
Stored Beam & Injection |
0200-0600 |
Orbit recovery |
Y.P. Sun |
Stored Beam & Injection |
0600-1130 |
S25 GRID xBPM studies |
Sereno et. al. |
Stored Beam & Injection |
1100-1200 |
Prepare for Tunnel Accesses |
OPS |
No Beam |
1100-1400 |
Troubleshoot S25C:H1 and C:V1 |
Wang |
No Beam |
1130-1330 |
Switch pump 517 for motor repairs (P.S. S17 through 20 set to 0) |
Wright |
No Beam |
1200-1430 |
Replace thermocouple on S36 Cav3 upstream cavity cover thermocouple |
RF Group |
Controlled Access Zone F |
1200-1430 |
Troubleshoot/replace IK3 blower |
Wright |
Controlled Access Zone F |
1300-1400 |
Switch back to the primary Klystron pump |
Dench |
No injection |
1300-1400 |
Guided APS tunnel tour |
S. Streiffer |
Authorized Access Zone A |
1430-1530 |
Prepare for SR Injection |
OPS |
Stored Beam & Injection |
1530-1700 |
SR Operator training (15-23) |
Grodecki/ Berkland |
Stored Beam & Injection |
1700-2100 |
ID4 aperture measurement |
Emery |
Stored Beam & Injection |
2100-2400 |
Vertical scraper for lifetime reference |
Emery |
Stored Beam & Injection |
|
Friday, September 11, 2020 |
|
|
0000-0100 |
Vertical scraper for lifetime reference |
Emery |
Stored Beam & Injection |
0100-0700 |
CPU/IEX checkout |
Xiao |
Limited Injection |
0100-0700 |
RG1 commissioning |
Y.E. Sun |
Limited Injection |
0700-1100 |
Beam arrival time detector calibration in BTS |
Sereno et. al. |
Limited Injection |
1100-1700 |
6 GeV measurement of instabilities |
Emery/ Lindberg |
Stored Beam & Injection |
1700-2100 |
6 GeV ID corrector feed-forward re-measurement |
Emery |
Stored Beam & Injection |
2100-2300 |
SR Operator training (15-23) |
Grodecki/ Berkland |
Stored Beam & Injection |
2300-2400 |
Booster momentum offset variation setup and emittance measurement in BTS |
Harkay |
Booster Beam |
|
Saturday, September 12, 2020 |
|
|
0000-0500 |
Booster momentum offset variation setup and emittance measurement in BTS |
Harkay |
Booster Beam |
0500-0700 |
Booster chrom correction test |
Yao/Shang |
Booster Beam |
0700-1100 |
Beam feedback setup |
Yao |
Stored Beam & Injection |
1100-1500 |
Sextupole offset measurement |
Sajaev |
Stored Beam & Injection |
1500-1600 |
Turn-by-turn BPM data with low chromaticity |
Huang/Sajaev/ Y.P. Sun |
Stored Beam & Injection |
1600-2000 |
Response matrix measurement |
Y.P. Sun |
Stored Beam & Injection |
2000-2200 |
SR Operator training (11-23) |
Grodecki/ Berkland |
Stored Beam & Injection |
2200-2400 |
Topup validation |
OPS |
Stored Beam & Injection |
|
Sunday, September 13, 2020 |
|
|
0000-0800 |
Topup validation |
OPS |
Stored Beam & Injection |
0800-1200 |
Pinhole camera and bunch purity setup |
Yang/Harkay |
Stored Beam & Injection |
1200-1600 |
Final lattice setup |
Xiao |
Stored Beam & Injection |
1600-2000 |
Final orbit setup |
Y.P. Sun |
Stored Beam & Injection |
2000-2200 |
SR Operator training (11-23) |
Grodecki/ Berkland |
Stored Beam & Injection |
2200-2400 |
Abort kicker checkout |
Harkay |
Stored Beam & Injection |
|
Monday, September 14, 2020 |
|
|
0000-0600 |
HOM search, Try H-plane feedback |
Emery/ Kallakuri |
Stored Beam & Injection |
0600-0800 |
Prepare for user Operations (24 singlets – Top-Up) |
Ops |
Stored Beam & Injection |