Machine Studies
Draft Schedule for Run02-12, 2020
September 28th 0800 – October 1st 0800
Time | Descriptions | Studiers | SR Status |
| Monday, September 28, 2020 |
|
|
0800-0810 | Collect XBPM orbit data | OPS | Stored Beam & Injection |
0810-1000 | Gap Scans and update IDGapFF look-up tables | Sereno | Stored Beam & Injection |
1000-1100 | Troubleshoot pump 405 affects S1&2 | Wright | No Beam |
1000-1200 | Troubleshoot iochdg1 | Pietryla | Limited Injection |
1000-1200 | Install canted correctors PS at 25ID | Vargas | No Beam |
1030-1130 | Valve off S25 GRID BPM / thermocouple work | MOM/Erwin | Access Zone D |
1030-1100 | Replace IR detector at S38 | MOM | Access Zone F |
1200-1300 | Test of BPLD validation script | Sereno/Shang | Stored Beam & Injection |
1300-1800 | S25 GRID BPM studies | Yang, et al | Limited Injection |
1300-1600 | BTS arrival time detector | Sereno, et al | Limited Injection |
1600-1800 | PAR training (15-23) | Ronzhin/Kimbro | Limited Injection |
1800-2400 | 6 GeV single and multi bunch instability thresholds | Emery/Lindberg | Stored Beam & Injection |
| Tuesday, September 29, 2020 |
|
|
0000-0600 | RG1 beam tune up | Y.E. Sun | Limited Injection |
0600-0700 | Booster currMon signal beam charge scan | Yao | Stored Beam & Injection |
0700-0900 | BTS response measurement | Yao/Shang | No Beam |
0900-0930 | Cable inventory | Dooling | Access Linac |
0900-1100 | Test canted correctors PS at 25ID | Jordan | No Beam |
0900-1200 | Waste management/IH assess PAR | WM/McGhee | Access PAR |
0900-1300 | RF-5 conditioning RF / waveguide switch | RF Group | Limited Injection |
1300-1500 | Measure SR orbit noise with water sound dampener in S37 off and on. And switch pumps too. | Emery/Wright | Stored Beam & Injection |
1500-1600 | Test Labca for APS | Huang/Y.P. Sun | Stored Beam & Injection |
1600-1800 | PAR training (15-23) | Ronzhin/Kimbro | Limited Injection |
1600-1700 | Orbit switch procedure improvements | Y.P. Sun/Shang | Limited Injection |
1800-2100 | Booster chrom correction test | Yao/Shang | No Beam |
2100-2400 | Booster emittance measurements vs momentum offset | Harkay, et al | No Beam |
| Wednesday, September 30, 2020 |
|
|
0000-0300 | Booster emittance measurements vs momentum offset | Harkay, et al | No Beam |
0300-0900 | RG1 Beam tune up | Y.E. Sun | Limited Injection |
0900-1300 | S27-28 FBC Fast Corrector Step Response measurement | Sereno, et al | Stored Beam & Injection |
1300-1700 | Sextupole offset measurement | Sajaev | Stored Beam & Injection |
1700-2000 | Turn-by-Turn BPM data taking | Huang/Sajaev/ Y.P.Sun | Stored Beam & Injection |
2000-2300 | Orbit switch procedure improvements | Y.P. Sun/Shang | Limited Injection |
2000-2200 | PAR training (15-23) | Ronzhin/Kimbro | Limited Injection |
2300-2400 | 6 GeV dimtel x-plane feedback | Emery/Kallakuri | Stored Beam & Injection |
| Thursday, October 1, 2020 |
|
|
0000-0300 | 6 GeV dimtel x-plane feedback | Emery/Kallakuri | Stored Beam & Injection |
0300-0600 | 6 GeV ID perturbation measurement | Emery | Stored Beam & Injection |
0600-0700 | Open |
|
|
0700-0800 | Prepare for User beam | OPS | Stored Beam & Injection |