Draft Schedule for Run02-5, 2020

July 13th 0800 – July 14th 0800



Time

Descriptions

Studiers

SR Status


Monday, July 13, 2020



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-1000

Gap Scans and update IDGapFF look-up tables

Sereno

Stored Beam & Injection

1000-1200

Set-up & test bumpless reboot for LNDS ioc

Marty Smith, Diviero

No Impact

1000-1200

Install Time-of-Arrival instrument for the Diagnostics group including module in iochbpm1

Pietryla

No beam

1030-1130

Replace a defective S40/C2 Upstream IR detector

Pace/Gonzalez

Access Zone F

1045-1115

Measure the beam pipe for collimator fabrication

Hoyt

Access LINAC

1130-1230

Recover machines

OPS

Stored beam & inj.

1230-1530

LB+ First Article SAT tests sector 27

Sereno

Stored beam & inj.

1530-1700

SR Operator Training (1500-2300)

Orne, Weyer

Stored Beam & Inj.

1700-2300

Check hybrid mode injection & switch to P0 Feedback and set up for hybrid mode

Yao, Emery

Stored Beam & Inj.

2300-2400

6 GeV dipole HOM search, 324 bunch mode

Emery, Kallakuri

Stored Beam & Occ. Inj.


Tuesday, July 14, 2020



0000-0500

6 GeV dipole HOM search, 324 bunch mode (continued)

Emery, Kallakuri

Stored Beam & Occ. Inj.

0500-0700

SR Operator Training (2300-0700)

Berg, Grodecki

Stored Beam & Inj.

0700-0800

Prepare for User beam

OPS