Machine Studies
Draft Schedule for Run02-5, 2020
July 13th 0800 – July 14th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, July 13, 2020 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-1000 |
Gap Scans and update IDGapFF look-up tables |
Sereno |
Stored Beam & Injection |
1000-1200 |
Set-up & test bumpless reboot for LNDS ioc |
Marty Smith, Diviero |
No Impact |
1000-1200 |
Install Time-of-Arrival instrument for the Diagnostics group including module in iochbpm1 |
Pietryla |
No beam |
1030-1130 |
Replace a defective S40/C2 Upstream IR detector |
Pace/Gonzalez |
Access Zone F |
1045-1115 |
Measure the beam pipe for collimator fabrication |
Hoyt |
Access LINAC |
1130-1230 |
Recover machines |
OPS |
Stored beam & inj. |
1230-1530 |
LB+ First Article SAT tests sector 27 |
Sereno |
Stored beam & inj. |
1530-1700 |
SR Operator Training (1500-2300) |
Orne, Weyer |
Stored Beam & Inj. |
1700-2300 |
Check hybrid mode injection & switch to P0 Feedback and set up for hybrid mode |
Yao, Emery |
Stored Beam & Inj. |
2300-2400 |
6 GeV dipole HOM search, 324 bunch mode |
Emery, Kallakuri |
Stored Beam & Occ. Inj. |
|
Tuesday, July 14, 2020 |
|
|
0000-0500 |
6 GeV dipole HOM search, 324 bunch mode (continued) |
Emery, Kallakuri |
Stored Beam & Occ. Inj. |
0500-0700 |
SR Operator Training (2300-0700) |
Berg, Grodecki |
Stored Beam & Inj. |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |